Laserfiche WebLink
.~ <br />IL PRINCIPALS <br />B. Authorized field representatives in addition to the owner and primary operator, Joseph L. <br />Dorris, is Timothy L. Dorris.. <br />Timothy L. Dorris is also the authorized field representative for GLAC>ERR PEAR Mining for the <br />listed claims in this operations plan. Hp is authorized to act on behalf of the owner and operator <br />in his absence and on an "as need be basis." This authorization runs concurrent with this <br />operations plan. <br />~~i~.-~ ~ A1v V o5 <br />SEPH L. DORRIS DATE <br />Owner/Operator Glacier Peak Mining <br />