Laserfiche WebLink
Joseph Dorris, Operator <br />Glacier Peak Plan of Operations -November 10, 2005 <br />VI. FOREST SERVICE EVALUATION OF PLAN OF OPERATIONS <br />B. Bond. <br />Reclamation of all disturbances connected with this plan of operations is covered by Reclamation <br />Performance Bond No. n/a , dated n/a , signed by n/a (Principal) and n/a (Surety), for the penal stun of <br />n/a This Reclamation Performance Bond is a guarantee of faithful performance with the terms and <br />conditions listed below, and with the reclamation requirements agreed upon in the plan of operations. This <br />Reclamation Performance Bond also extends to and includes any unauthorized activities conducted in <br />connection with this operation. <br />The bond amount for this Reclamation Performance Bond was based on a bond calculation worksheet <br />(attached). The bond amount maybe adjusted during the term of this proposed plan of operafions in <br />response to changes in the operations or to changes in the economy. Both the Reclamation Performance <br />Bond and the bond calculation worksheet aze attached to and made part of this plan of operations. <br />Acceptable bond securities (subject to change) include: <br />1. Negotiable Treasury bills and notes which aze unconditionally guaranteed as to both principle <br />and interest in an amount equal at their paz value to the penal sum of the bond; or <br />2. Certified or cashier's check, bank draft, Post Office money order, cash, assigned cetliftcate of <br />deposit, assigned savings account, blanket bond, or an irrevocable letter of credit equal to [he <br />penal sum of the bond. <br />The bond amount will be reviewed annually and adjusted to compensate for completed reclamation work, <br />changes in equipment rental rates, increased scope of operations, etc. <br />Bond Calculation: <br />Bond calculation no[ complete. <br />The following is the bond calculation worksheet prepared by the South Park Ranger District. The total <br />amount of the bond amount is $20.651based upon the curent amount being held for the operation. An <br />additional amount of $0 will be needed before the operating plan is approved. <br />Present bond held with State of Colorado, Division of Minerals & Geology: $ 20,651 <br />Present bond held with the US Forest Service, South Pazk Ranger District: $ 0 <br />Total bond amount presently being held: $ 20,651 <br />