Laserfiche WebLink
. <br />EXHIBIT "E" <br />RECLAMATION PLAN <br />A. The material will be mined in such a manner as to leave~a <br />surface contoured to reflect the natural topography of the <br />surrounding area; gently sloping to sloping. <br />B. When the mining is completed, the area will be revege.tated. <br />C. No new slopes will be left steeper than 3:1. <br />D. The historic land use was for sand and gravel mining. The i <br /> future use is for very limited rangeland. <br />E. The mining in the area will have minor affect on wildlife. <br />F. The following seeding and fertilizing specifications are <br />to be included into the construction plans and required <br />within the affected area: <br />Timetable of 0 erations <br />ays - of preparation <br />1? days - Seeding and Mulching <br />Total reclamation time - 3 days <br />Seeding, Soil preparation, Fertilizing with manure and <br />mulching for approximately 9.8 acres will be required. <br />"Revegetation Recommendations" as outlined on Sheet 3 of 4, <br />EXHIBIT "D" (Part 2 of 3) will be followed if then contem- <br />poraneously appropriate, and otherwise only limited by the <br />lack of any of the seed or seedlings not being commercially <br />available. <br />