My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE113787
DRMS
>
Back File Migration
>
Permit File
>
200000
>
PERMFILE113787
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:09:59 PM
Creation date
11/24/2007 10:59:09 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2001051
IBM Index Class Name
Permit File
Doc Name
CIRCES COST ESTIMATING SOFTWARE SCRAPER TEAM WORK
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
l - <br />CIRCES Cost Estimating Software <br />BULLDOZER WORK <br />PROJECT IDENTIFICATION <br />Task # : 009 <br />Date : 08/14/2001 <br />User : LDO <br />Agency or organization name : DMG <br />Permit or other job action :new application reclamation cost estimate <br />Task description :build haul ramps for scraper use <br />• • <br />State :Colorado <br />County : Larimer <br />Site :North Taft Hill Expansion <br />Basic machine :Cat D8R - 8U <br />Blade type :Universal <br />Attachment no. 1 : HOPS Cab <br />Attachment no. 2 : NA <br /> Utilization <br />Ownership cost/hour : $43.30 NA <br />Operating cosUhour : $66.26 100 <br />Ripper op. cosUhour : $0.00 NA <br />Operator cosVhour : $27.99 NA <br />Total unit cosUhour : 3137.56 Total fleet cosUhour <br />ci~~ to <br />Swell Loose <br />BCY factor : 1.120 volume : 11,200 LCY <br />Source of estimated volume :cost estimate <br />Source of estimated swell factor :cat hndbk <br />HOURLY EQUIPMENT COST <br />Cost Breakdown <br />MATERIAL QUANTITIES <br />Initial <br />volume: 70,000 <br />HOURLY PRODUCTION <br />Average push distance : 70 feet <br />Unadjusted hourly production : 1,249.9 LCY/hr <br />Material consistency description <br />Compacted fill or embankment <br />Average push gradient : 15.00 % (neg) <br />Average site altitude : 5,020 feet <br />Material weight : 3,250 Ibs/LCY <br />Weight description <br />Gravel - Pitrun <br />JOB TIME AND COST <br />Fleet size : 1 Dozers) <br />Unit cost : $0.290 /LCY <br />Job Condition Correction Factors Source <br />Operator skill : 0.75 (avg.) <br />Material consistency : 0.90 (Cat HB <br />Dozing method : 1.20 (slot) <br />Visibility : 1.00 (avg.) <br />Job efficiency : 0.83 (lshilUda <br />Spoil pile : 0.60 (/nd-sf) <br />Push gradient : 1.33 (Cat HB <br />Altitude : 1.00 (Cat HB <br />Material weight : 0.71 (Cat HB <br />Blade type : 1.00 (S/SU/!/ <br />NeT correction : 0.38 <br />Adjusted unit production : 474.04 LCY/hr <br />Adjusted~fleet production : 474.04 LCY/hr <br />PermiUjob# : M-2001-051 <br />Abbreviation :none <br />Filename : M051-009 <br />Total job time : 23.63 Hours <br />Total job cost : $3,250 <br />Horsepower: 305 <br />Shifl basis : 1 per day <br />Data source : (CRG) <br />
The URL can be used to link to this page
Your browser does not support the video tag.