Laserfiche WebLink
<br /> <br />CIRCES Cost Estimating Software <br />MOTOR GRADER WORK <br />PROJECT IDENTIFICATION <br />Task # : 005 State :Colorado <br />Date <br />User <br />08/14/2007 <br />LDO <br />County :Lorimer <br />Sile :North Ta/t Hill Expansion <br />PermiUjob # : M-2001-051 <br />Abbreviation :none <br />Filename : M051-005 <br />Agency or organization name : DMG <br />Permit or other job action :new application reclamation cost estimate <br />Task description :rip buffer, overburden stockpile, top of dike and bank slope topsoil area <br />HOURLY EQUIPMENT COST <br />Basic machine :CAT 14H <br />Attachmentno.l:NA <br />Attachment no. 2 : Multi-shank <br />Oost Breakdown Ownership cosUhour <br />Grader operating cosUhour <br />Ripper operating cosUhour <br />Operator cost/hour <br />Total unit cosUhour <br />Horsepower: 215 <br />Shift basis : 1 per day <br /> <br /> <br />$40.78 Data source <br />Utilization <br />NA <br />$44.14 700 <br />$4.31 100 <br />$28.18 NA <br />$11741 Total fleet cost/hour <br />MATERIAL QUANTITIES <br />Total area to be graded or ripped : 12.00 acres <br />Source of estimated acreage :exhibit E <br />ICRGI <br />5117.41 <br />HOURLY PRODUCTION <br />Selected application :Ripping (0-3 mph) <br />Average grader speed : 1.50 mph <br />Selected blade angle : NA degrees ' ' at 0 degrees, blade is perpentlicular <br />Effective blade length : NA feet to direction of gavel. <br />Width of blade overlap per pass : NA feet <br />Net grading or ripping width per pass : 8.50 feet " " witllb of ripper beam on ripping applicati ons <br />Unadjusted hourly unit production : 1.5455 acres/hour <br />Job Condition Correction Factors Source <br />Average site altitude : 5,020 feet Altitude adjustment factor: 1.00 (Cat HB) <br /> Job efficiency adjustmant factor : 0.85 ()sh/d, mod.) <br /> Net job correction : 0.8500 multiplier <br /> <br />Adjusted hourly unit production : 1.3136 acres/hour <br />Adjusted hourly fleet production : 1.3136 acres/hour <br />JOB TIME AND COST <br />Fleet size : 1 grader(s) Total job time : 9.13 hours <br />Unit cost : $89.38 per acre Total job cost : $1,073 <br />