My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE113777
DRMS
>
Back File Migration
>
Permit File
>
200000
>
PERMFILE113777
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:09:58 PM
Creation date
11/24/2007 10:58:24 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981022
IBM Index Class Name
Permit File
Doc Date
12/11/2001
Doc Name
SAFETY BENCHING ABOVE D SEAM PORTAL (ABEL 2000)
Section_Exhibit Name
Exhibit 2.05-E2 Part 7
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Sent By: OXBG!"~ MINING INC.; <br />970 929 5177; Nov-20-UO S:G2PM; Paye 9i9 <br />Catch bench recommendations Page 2 November B, :;OGO <br />See attached figure from Ca11 )1986). Similarly, the wider a catch <br />bench the more effective it will he and the longer it will <br />function. The width of a catch bench is also controlled by the <br />bench height and the maximum size nt the rock blocks which may be <br />released over time. In this case the roughly 40foot thickness of <br />the upper sandstone bed, rather ttlall the 15foot thickness of the <br />lower sandstone bed, will control and require an approximately <br />22foot wide catch bench. <br />The access road up to the catch bench can also Serve as mi~:or <br />catch benches between the sw1Lc:Y~ backs. They should be sloped <br />slightly inward toward the slope. The inward slope will also serve <br />to channel water toward the sides and off the slope through the <br />down drain riprap channels: The sensitive nature of the clays <br />present in the slope mass necessitates removing rain and snow melt <br />water from the slope as rapidly as possible. The riprap channels <br />should be extended up to the catch bench. Culverts should be <br />placed through the access road where the riprap channels intersect <br />and intercept any water in the access road. It will probably be <br />necessary to clean out the culverts when clearing debris frc+m the <br />catch bench. <br />The safety of the crew excavating the catch bench belo+.f <br />the lower sandstone bed should be enhanced by scaling of the <br />obviously loose blocks of rock at the crest of the two sandstone <br />beds and sitting precariously on Lhe angle of repose shale slope <br />between the two sandstone beds. Removing these loose rock blocks <br />now will also extend the time interval between the periodic <br />clearing of debris that will collect on the catch bench. <br />Sincerely, <br />John F. Abel, Jr. <br />Colorado P.E. 5642 <br /> <br />11-28-88 16:47 TO:MONTGOMERY WAT5ON FROM:97B 929 5177 P09 <br />
The URL can be used to link to this page
Your browser does not support the video tag.