My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE113660
DRMS
>
Back File Migration
>
Permit File
>
200000
>
PERMFILE113660
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:09:51 PM
Creation date
11/24/2007 10:52:39 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2005051
IBM Index Class Name
Permit File
Doc Date
7/25/2005
Doc Name
comments from other agencies
From
dmg
To
aca products inc
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STATE OF <br />OFFICE OF THE STATE ENGINEER <br />Divrsion of Water Resources <br />Departrnen[ of Natural Resources <br />1313 Sherman Street, Room 818 <br />Denver, Colorado 80203 <br />Phone (303) 866-3581 <br />FAX (303) 866-3589 <br />www.watecstate. co. us <br />RECEIVED <br />~c~ <br />w <br />R <br />• ~a~a <br />JUL 1 5 2~5 <br />Division of Minerals and Geology <br />Response to Reclamation Permit Application Consideration <br />DATE: July IS, 2005 <br />TO: Erica S Crosby, Environmental Protection Specialist <br />CC: Division Z Office; Dis 'ct l 1 Water Commissioner <br />FROM: Don West, P.E. <br />RE: River Park Recreatien Access, File No. M-2005-051 <br />Operator. ACA Products, Inc. <br />Contact: Gary Cambell 719/395-3790 <br />Section 27, Twj1 145, Rng 78W, 6th P.M., Chaffee County <br />8iq Owens <br />~~ <br />Russell eeoige <br />Executive Direo'.or <br />Hal D. Simpson, P.E. <br />State Engineer <br />CONDTfIONS FOR APPAO VAL <br />® The proposed operation does not anticipate exposing groundwater. Therefore, exposure of ground <br />water must not occur during or after mining operations. If stormwater is contained on-site, it must <br />infiltrate into the ground or be released to the natural stream system within 72 hours, or all work <br />must cease until a substitute water supply plan, or augmentation plan approved by water court, is <br />obtained. Reclamation plans must ensure water will mat be retained onsite for more than 72 hours <br />unless an augmentation plan approved by water court is obtained. <br />^ The proposed operation will consume ground water by: ^ evaporation, ^ dust control, <br />reclamation, ^ water removed in the mined product, ^ processing, ^ other:. <br />Prior to initiation of these uses of ground water, the applicant will need to obtain either a gravel pit <br />or other type of well permit, as applicable. However, prior to obtaining a pctmit, an approved water <br />supply plan or decreed plan for augmentation is required. <br />^ Prior to approving a well permit, the applicant must conduct a field inspection of the site and <br />document the locations of all wells within 600 feet of the permit azea. The applicant must tlten <br />obtain a waiver of objection from all well owners with wells within 600 feet of the permit area or <br />request a hearing before the State Engineer. ' <br />^ Other: <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.