Laserfiche WebLink
• <br />TABLE 12-2 <br />Annual Coal Production tar Yoast <br />Coal Acres Estimated <br />Year Mined Total Tonnage <br />1995 0 0 <br />1996"' 6. 08 137,600 <br />1997"' 41. 18 905,400 <br />1998 37. 90 812,200 <br />1999 47. 20 798,400 <br />2000-2004 309. 00 5,505,800 <br />Total 441 .36 8,159,400 <br />"The data for 1996 and 1997 are actuals. Stripping at Voast began in October 7996. <br />• All other data is estimated. <br />I <br />7 Revised 2/99 <br />