Laserfiche WebLink
06/20/99 SUN 21:11 FAR 303 452 9515 ADCO/CHEROKEE/BAYER ¢j 002 <br />• i <br />~ecial Excavation Setback and Other Restrctions <br />1. No mining shall occur within 400' of the proposed channel limits of the adopted <br />Master Plan of the S. Platte River without permission from UD&FCD on <br />conditions of mining within this 400' azea. If permission from UD&FCD on <br />mining within 400' of the proposed channel limits of the adopted Master Plan of <br />the S. Platte River is obtained, mining within 100' of the existing bank along the <br />east side of the River in Phases 1 and 2 shall only occur between October of one <br />yeaz to March of the next year. If permission is obtained from UDFzFCD, a copy <br />of said agreement shall be submitted to the DMG. <br />2. No slurry wall installation across the PSCo. right-of-way, nor any mining within <br />200' of the PSCo. towers shall occur without mutual execution of the license <br />agreement dated June 16, 1999 between CAMAS and PSCo. A copy of this <br />executed license agreement shall be submitted to the DMG. <br />3. No mining shall occur within 50' of any power poles owned by United Power <br />within adjacent right-of-way without agreement by United Power on a lesser <br />setbclc If agreement on a lesser setback is obtained from United Power, a copy of <br />said agreement shall be submitted to the DMG. <br />4. No mining shall ocnu with 200' of the Sinclau gas pipeline without agreement on <br />a lesser setback from the Sinclair Pipeline Company, or without permission from <br />the Sinclair Pipeline Company, approval by the DMG of a lesser setback with <br />appropriate conditions based on a revised Slope Stability Analysis. In the event <br />agreement is obtained from the Sinc]air Gas Pipeline Company on a lesser <br />setback, a copy of said agreement shall be submitted to the DMG. <br />5. No mining shall occur within 65' of the top bank of the Fulton Ditch without <br />agreement on a lesser setback from the Fulton Ditch Company. If agreement is <br />obtained from the Fulton Ditch Company on a lesser setback, a copy of said <br />agreement shall be submitted to the DMG. <br />6. No mining shall ocaus in Phases 1 ;2, or 5 (Plant Area), until a wetland inventory <br />is acceptcd by the Corp of Engineers and 404 permit is issued allowing removal <br />of any identified wetlands along with a wetlands replacement mitigation plan, and <br />copy of said 404 permit is submitted to the DMG. <br />