Laserfiche WebLink
2dHG1 E-0. SXC Project Pla» <br />Minor Revision 327- Revision <br />Page 10 of l l <br />ANTICIPATED SCHEDULE <br />Drilling of these wells is anticipated to commence November 16, 2005 depending on drill <br />rig availability and USFS approval. It will take approximately 3 days to drill and <br />complete each of the hole(s) and another week to perform interim reclamation. <br />The term of use is variable due to levels of gases found in the mine as a result of the <br />drilling and the level of success of pumping water, foam, and nitrogen into the mine. <br />MEASURES TO BE USED TO COMPLY WITH PERFORMANCE STANDARDS <br />FOR THE PROJECT (43 CFR 3484.1(a), 30 CFR 815.15, and Colorado Division of <br />Minerals and Geology Rules and Regulations) <br />Operator shall comply with applicable requirements of surface management <br />agency, 30 CFR 815.15, or approved State program. <br />Mountain Coal Company has reviewed, and will comply with, all applicable requirements <br />of 30 CFR 815.15 and the Colorado Mined Land Reclamation Regulations stated in <br />C.R.S. 34-33-101. <br />2. Install casing and blowout preventers in drill holes in known oil, gas, and geothermal <br />azeas. <br />It is anticipated that gas will be encountered in the tubblized-zone of the B Seam. Gas is <br />known to be encountered after mining in previous methane drainage holes in the area. <br />Casing will be set in each hole as necessary to maintain circulation of cuttings to the <br />surface. <br />3. brill hole plugging requirements. <br />In accordance with the Coal Program Guidance Document -Methane Drainage and <br />Monitoring Wells, MCC will plug and abandon these MDWs per DMG Rules 2.05.4 and <br />4.07.3 at the minimum. A mechanical packer will be set at the lowest possible point in <br />the well (note that subsidence damage to the casing may preclude access to the entire <br />depth of the casing). Above this packer the hole will be plugged with CDMG approved <br />materials to the bottom of the 5-foot cement surface cap using tremmie line. The top 5- <br />feet of the well below the sub-surface casing cut-off point (3-feet below the surface) will <br />be plugged with a cement cap. The top 3-feet of the casing will then be cut off and the <br />hole filled in with subsoil. A permanent marker shall be installed on top of the plug <br />identifying the well. The pad will then be reclaimed to approximate original contour. <br />The Methane Drainage Well drilling experience for Mountain Coal Company has shown <br />that no aquifers have yet been encountered. However, the procedures described above <br />would serve to properly protect any aquifers that would be encountered. <br />4. Retention of drill logs by applicant. <br />