Laserfiche WebLink
<br /> <br />COLOWYO COAL COMPANY <br />009A -SECTION 16 <br />SEDIMENTATION POND SUMMARY <br /> ORIGINAL 1996 1998 2002 DIFFERENCE <br /> CONFIGURATION STUDY STUDY DIFFERENCE STUDY 1998 TO 2002 <br />ATERSHED AREA (acres): <br />DisiuNed 0.0 0.0 0.0 0.0 <br />Postmining Topsoiled and Seeded 25.0 80.3 55.3 17.6 -62.7 <br />Postmining Untlisturbetl 36.0 32.9 -3.1 53.7 20.8 <br />i-2 Vear Reclamation 33.5 27.1 -6.4 47.7 20.6 <br />3+Vear Reclamation 78.0 59.9 -18.1 146.4 86.5 <br />Total Area 172.5 200.2 27.7 265.5 65.3 <br />POND PARAMETERS: <br />Bottom Elevation 7740.2 7740.2 7740.2 0.0 7740.2 0.0 <br />Principal Spillway Invert Elevation 7752.9 7752.0 7752.9 0.9 7752.9 0.0 <br />Emergency Spillway Invert Elevation 7754.5 7754.5 7754.5 0.0 7754.5 0.0 <br />Top of Embankment 7756.0 7756.0 7756.0 0.0 7756.0 0.0 <br />Storage Volume Below Emergency Spillway (ac-f0 5.31 5.31 5.31 0.00 5.4 0.1 <br />Storage Volume Below Principal Spillway (ao-ft) 4.35 3.87 4.35 0.48 4.4 0.1 <br />Principal Spillway Parameters: <br />Type Drop Inlet Drop Inlet Pert. Riser PeA. Riser <br />Riser Diameter (in) 12.0 12.0 12.0 0.0 12.0 0.0 <br />Riser Height (ft) 9.2 8.3 9.2 0.9 9.2 0.0 <br />Barrel Diameter (in) 12.0 12.0 12.0 0.0 12.0 0.0 <br />Elevation of Perfomgon(s) (ft) N/A N/A 7746.0 7746.0 <br />Size of Perforetion(s) (in) N/A N/A 4.0 4.0 <br />Number of Pertorations N/A N/A 2 2.0 <br />Emergency Spillway Parameters'. <br />Type Trapezoidal Trapezoidal Trapezoidal Trapezoidal <br />Diameter (in) N/A N/A N/A N/A <br />Bottom Width (ft) 20.0 20.0 19.0 -1.0 19.0 0.0 <br />Length (ff) 15.0 15.0 17.0 2.0 17.0 0.0 <br />Side Slopes'z'H:1V (tt) 2.0 3.0 2.0 -1.0 2.0 0.0 <br />HYDROLOGIC/HYDRAULIC PARAMETERS: <br />Base Flow Rates (cfs) 3.00 0.03 -2.97 0.00 0.0 <br />10-Year, 24-Hour Storm Event: <br />Precipitation (in) 1.8 1.8 0.0 1.8 0.0 <br />Runoff Volume (aoft) 1.5 4.7 3.2 0.4 -0.3 <br />Principal Spillway Peak Discharge (cfs) 5.2 2.2 -3.1 0.4 -1.8 <br />Emergency 6palway Peak Discharge (cfs) 0.0 O.D 0.0 0.0 0.0 <br />Peak Surface Water Stage Elevation (ft) 7753.9 7752.4 -1.5 7746.2 -6.2 <br />25-Year, 24Hour Stonn Event <br />Pre~pitation (in) 2.3 2.3 0.0 2.3 0.0 <br />Runoff Volume (aok) 2.7 7.6 4.9 1.9 -5.7 <br />Principal Spillway Peak Discharge (cfs) 6.0 4.8 -1.2 1.1 -3.7 <br />Emergency SpilNvay Peak Discharge (cfs) 2.3 2.4 0.1 0.0 -2.4 <br />Peak Surface Water Stage Elevation (ft) 7754.6 7754.6 D.0 7747.6 -7.0 <br />Pond Freeboard (H) 1.4 1.4 0.0 8.4 7.0 <br />SEDIMENT LOADING PARAMETERS: <br />Storm Predicted Peak Settlable Concentration (mVl) 0.00 0.00 0.0 0.00 0.0 <br />Predicted Annual Sediment Loading (ac-ft) 0.17 0.24 0.07 0.12 -0.1 <br />Available Sediment Storage Volume (acts) 0.54 0.54 0.00 0.56 0.0 <br />Maximum Sediment Storage Elevation (ft) 7743.7 7743.7 7743.7 0.0 7743.7 0.0 <br />Predicted Number of Storage Years 3.2 2.3 -0.9 4.7 2.5 <br />• <br />