Laserfiche WebLink
,~ <br />" a. The estimated reclamation cost for backfilling and grading and <br />retopsoiling Pit 4 is calculated at 5485,538. This amount was determined by <br />subtracting the reclamation costs set forth in § V(3) of this Agreement and the <br />550,000 retained bond amount, from the 5572,000 bond set by the Board. <br />" b. The Division and Rockcastle agree that the approximate amount <br />of overburden and topsoil material required to fill Pit 4 is 585,000 bank cubic <br />yards. <br />~' C. The "Per Yard Amount" is 50.83 bank cubic yard of volume <br />reduction of Pit 4. The Per Yard Amount was determined by dividing the estimated <br />reclamation cost in § V(2)(a) by the amount of material described in § V(2)(b). <br />" 3. The Division shall release the following amounts of Rockcastle's <br />performance bond upon completion of the following activities pursuant to the <br />following schedule: <br />-~a. Reseeding of Pit 4 pursuant to § II(3) and II(4) = 518,906; <br />'~b. Road buttressing, as may be necessary pursuant to § IV(2) _ <br />515,000. <br />`~c. Pond reclamation, as may be necessary pursuant to § III(2) _ <br />540; 25~~ <br />,5 " <br />Jd. Pit 4 regrading = 52,516. v <br />-9- <br />t <br /> <br />