Laserfiche WebLink
' Draft: Apri! S, 1999 <br />Page B-3 <br />' - Record the exact measurement as read from the cable and/or tape. Do not perform any <br />calculations or rounding before recording value. If corrections aze necessary, due to <br />adjustments (splices) in the sounder cable, perform those calculations AFTER the raw <br />data has been recorded. <br />' - After recording the depth, repeat the measurement to confum the depth. <br /> - Tum the meter off and reel up cable. <br /> - Decontaminate probe and cable according to the Standard Operating Procedures for <br /> Equipment Decontamination, if applicable. <br /> - Replace inner and outer protective caps. Be sure to lock outer cover, if applicable, <br /> replacing old lock if necessary. Alternatively, proceed with groundwater sampling. <br />' P <br />l <br />ill <br />l <br />f <br />ll <br />th <br />dditi <br />l <br />id <br />li <br />f <br />l <br />l <br />di <br /> ersonne <br />w <br />a <br />so <br />ow <br />o <br />ese a <br />ona <br />gu <br />e <br />nes <br />or water <br />eve <br />soun <br />ng: <br />' - Do not drop anything down the well. If any equipment is lost down the well, document <br /> the occurrence. <br />' Report any damaged, blocked, or otherwise deficient wel Is to the environmental manager <br />for repair or closure. <br />1 <br /> <br /> <br /> <br /> <br /> <br /> <br />1 <br />1 <br />' Agapito Associates, Inc. <br />