My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE113361
DRMS
>
Back File Migration
>
Permit File
>
200000
>
PERMFILE113361
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:09:32 PM
Creation date
11/24/2007 10:28:59 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2000087
IBM Index Class Name
Permit File
Section_Exhibit Name
EXHIBIT L RECLAMATION COST
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
-:~~~~• II11111111111111111 <br />999 <br />:~ <br />~, <br />EXHIBIT L - RECLriAfiATlON COST' <br />~. <br />We have selected the phase of the mining t)tat irtcludcs tltc largest at'ca that will be disturbed at one <br />lime to calculate the potential reclamation liability. This will occur during phase 3. <br />Activity Quantity Units Un9t Cost Cost <br />A. Stripped overburden and tnpsoil- <br />appmxiutatcly 29 acres of disturbance <br />1. Replace overburden 39,111 CY $.84 $32,K53 <br />2. Replace 12" of topsoil 19,555 CY $.R4 $ 11,426 <br />3. Sccd and mulch )0 Acres 4400 $4,000 <br />B. Road - to runtain for future access <br />C. Processing area -equipment is portable and <br />would be romoved by the operator <br />l . 12emm'e concrete base for scale 120 CY $GS $7,800 <br />2. Scarify ground l0 Acres $150 $1,500 <br />3. Spread 12"topsoil 16,200 CY $.84 $13,608 <br />4. Seed and mulch 10 AI:rC! 4400 $4,000 <br />i>. Settling pond <br />1. Place 5'overburden on 1 acre 8,100 CY $.84 $6,804 <br />2. Place 12" Copsoil nn 1 acre I,GZU CY $.84 $1,3GU <br />3. Sccd end mulch I Acres $400 $400 <br />t. Recharge pond <br />1. Place I0' overburden on S acres 16,200 f.Y $.84 $13,608 <br />2. Place 12"topsoil on 5 acres 8,100 CY 4.Sd $5,184 <br />3. Seed aitd mulch S Acres 4400 42,000 <br />P. Phase 2 lake shore final grade seed 1~ mulch <br />1. 1•'inishrd Grading 21,000 CY 4.84 $17,640 <br />2. Replace topsoil - 12" on 3 acres 5,000 CY 4.84 44,200 <br />3. Seed and mulch 3 Acres 5400 $1,200 <br />G. Silt pond rcclamaliort/wctlanil crcaGon <br />1. Surd to specified wctl'and mix. 17 Acres 5400 46,800 <br />li. Plantings <br />1. Plant bees and shrubs I LS $60,000 460,000 <br />I. 20% Slurry wall installation' (per DMG <br />20% bonding rcquiremcnQ <br />1. Excavation, materials, labor <br />2. Pit dcwatering costs 99,245 pace Pt 43.00 $297,735 <br />'assumes 10,338 li»er feet, averugc depth 45' times 20% <br />~3,a~9 <br />o ~, ~O 1S <br />2,y-L~ <br />~oZu~7~a- <br />a3,~~v <br />~~ ~[~ D <br />G~j Uo d <br />~i7, 7~ <br />~a~9a- <br />175~~ ~~ <br />)~7~' <br />--- - <br />~-~4?~~/ <br />
The URL can be used to link to this page
Your browser does not support the video tag.