Laserfiche WebLink
OCM Corps Mitigation Plan <br />• SEM Charge OCM °Jo OCM Charge <br />Jay -Foreman E 362.50 20% $ 72.50 <br />Mobilize 426 Hoe - Peterbuilt 130.00 20% 26.00 <br />Mobilize 225 Hoe - Girardi Towing 320.00 20°J° 64.00 <br />428 Hoe 1100.00 20°~ 220.00 <br />225 Hoe 11187.50 20°~ 2237.50 <br />Peterbuilt Dump Truck 1072.50 40% 429.00 <br />Pick-up 715.00 20% 143.00 <br />Demob 426 Hoe - Peterbuilt 130.00 50% 65.00 <br />Demob 225 Hoe - Girardi Towing 300.00 20°~ 60.00 <br />American Excelsior 38.63 0°~ 0.00 <br />American Excelsior 2022.00 0°~ 0.00 <br />Grand Junction Pipe 420.23 0°h 0.00 <br />Herzog Environmental -dump fees 350.00 100°k 350.00 <br />Parkerson Construction - Riprap 1573.95 0% 0.00 <br />SEM Total <br />$ 19,720.31 $ 3,667.00 <br />Seeding -Environmental Reclamation Servic $ 1,933.92 0.2 386.78 <br />i <br />Total Mitigation Cost $ 21,654.23 <br />OCM -Total Charge 18.7°,6 S 4,053.78 <br />• <br />