My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE113268
DRMS
>
Back File Migration
>
Permit File
>
200000
>
PERMFILE113268
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:09:27 PM
Creation date
11/24/2007 10:24:20 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981022
IBM Index Class Name
Permit File
Doc Date
12/11/2001
Doc Name
US ARMY CORPS OF ENGINEERS
Section_Exhibit Name
Exhibit 2.03-E4 Part 9
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
65
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DEPARTMENT OF THE ARMY <br />U.S. ARMY ENGINEER DISTRICT SACRAMENTO <br />CORPS OF ENGINEERS <br />1325 J STREET <br />ner~rro SACRAMENTO, CALIFORNIA 9591Y2922 <br />•T7ENTOM OF <br />May 28, 1997 <br />Regulatory Branch (199675449) <br />Mr. Thomas Anderson <br />Oxbow Carbon and Minerals <br />Post Office Box 535 <br />Somerset, Colorado 81434 <br />Dear Mr. Anderson: <br />- We are responding to a request by Mr. Jerry M. Nettleton of <br />TerraMatrix/Montgomery Watson on your behalf for a Department of <br />the Army permit for approximately 1,450 feet of headwaters <br />impact. The project is located within Section e, Township 13 <br />South, Range •90 West, Gunnison County, Colorado. <br />The Chief of Engineers has issued nationwide general permit <br />number 26 which authorizes the discharge of dredged or fill <br />material in waters of the United States for headwaters and <br />isolated waters discharges. Your project can be constructed <br />• under this authority provided the work meets the conditions <br />listed on the enclosed information sheets and the following <br />special conditions: <br />1. The permittee shall perform reclamation procedures as <br />outlined in your application by TerraMatrix/Montgomery Watson <br />following the life of the project. <br />2. To compensate for the loss of 1,450 feet of headwaters <br />channel a final mitigation plan to offset these impacts at a 1:1 <br />ratio will be required. The Mitigation plan must be approved and <br />implemented concurrent with project construction in <br />jurisdictional waters of the United States. <br />The Corps of Engineers has made a determination of "no <br />affect" on threatened or endangered species for this project. <br />This permit verification will be valid until December 13, 1998. <br />You should contact this office if work will extend beyond this <br />date. You must also notify this office in writing within 30 days <br />after project completion that the work was performed in <br />accordance with this authorization. <br />• <br />
The URL can be used to link to this page
Your browser does not support the video tag.