Laserfiche WebLink
<br /> <br />EXIiIBIT B - MINING PLAN <br />bake City Mines - Golden Wonder Mine <br />March 10, .1978 <br />Mining will be by underground stope method by drilling <br />and blasting and removing ore and waste with trackless equip- <br />ment through the new portal and adit shown on Exhibit C-2. The <br />waste will be dumped down slope to the south and west of the <br />portal. Ore will be stock piled as shown on Exhibit C-3 and <br />loaded with a front end loader and hauled out by truck over the <br />existing road to the north. A maximum of 375 tons of waste and <br />125 tons of ore is expected to be produced each month, a total <br />of 6,000 tons per year. <br />EXHIBIT B <br />