<br />EXHIBIT E - REC.LADtATION PLAN <br />Lake City Mines - Golden wonder mine <br />A9arch 10 , 1978 <br />All topsoil from the road and portal construction areas will <br />be stock piled with maximum 2:1 slopes and seeded to prevent erosion. <br />A maximum of approximately 12,000 tons of waste will be tem- <br />porarily dumped down slope as shown in Exhibit C-3 during the first <br />2 to 3 years operation. After that time waste produced will be re- <br />turned underground to stope areas worked out by this operation and <br />II by previous operations from the old Golden Wonder Mine. <br />Upon completion of the operation the road will be smoothed <br />over a.nd the waste pile will be worked to a finish grade of about <br />1,5 to .l. Top soil with mineral fines added if required will be <br />spread evenly and the entire disturbed area will be seeded and <br />fertilized in accordance with BLM and Soil Conservation recommenda- <br />tions at the time. <br />All equipment will be removed and the portal sealed in accord- <br />ance with applicable Colorado law prior to grading. <br />EXI{IBIT E <br />