My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE113241
DRMS
>
Back File Migration
>
Permit File
>
200000
>
PERMFILE113241
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:09:25 PM
Creation date
11/24/2007 10:22:58 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981014
IBM Index Class Name
Permit File
Doc Date
12/11/2001
Doc Name
TR-12 and MR-19
Section_Exhibit Name
EXHIBIT 15 Part 8
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
April 1992 MR-19 Pneumatic Coa/ Oryinp lnstallatlon • Pape ~ 2 <br />• Z.04 ENVIRONMENTAL RESOURCES <br />Information on environmental resources presen[ed in Section 2.04 of [he EFCI Permit <br />Appliation document addresses the entire Southfield Permit Area, including the si[e of the <br />proposed dryer installation. Also, installation and operation of the proposed coal dryer will not <br />result in any signifiant additional environmental impacts beyond thou contemplated in the <br />existing permit appliation. <br />5.05 OPERATION AND RECLAMATION PLANS <br />Installation of the proposed pneumatic coal dryer will involve limited construction within the <br />existing disturbance ara currently utilized for coal storage and handling. Construction will <br />specifically involve the following activities: <br />• Install Foundation Structures <br />• Erect Hopper Structure <br />• Install Cyclone Dryer <br />• Erect Pneumatic Pipeline, Walkway and Support Structures <br />• Install Modulaz Feeder and Pump Systems <br />The configuration and relative lontions of each of the structures identified above are shown on <br />• the Mine Surface Facilities Map, (Map 18), with plan and elevation details more clearly <br />illustrated by Figure 19-1, Pneumatic Coal Drying System -Conceptual Design. Construction <br />activities, as well as operational and reclamation considerations are discussed in the following <br />sections. <br />INSTALL FOUNDATION STRUCTURES <br />In order to insure long-term stability and structural integrity, adequate foundation structures will <br />be required for both the product surge hopper and truss rupports. The surge hopper and <br />columns which will support the integrated truss walkway/pipeline structures will be mounted <br />on concrete footings poured around driven steel pilings. The hopper will require eight footings <br />spaced evenly on the hopper perimeter as shown on Figure 19-1, Pneumatic Coal Drying System <br />- Conceptual Design. The support columns will each be mounted on separate footers with <br />extended piling supports to provide additional rigidity. <br />ERECT HOPPER STRUCTURE <br />The hopper structure will be a pre-fabriated steel bin with support legs, discharge chute and <br />slide gate, and upper support structure for the ryclone dryer and integrated <br />truss/walkway/pipeline structure. The hopper structure, which will weigh approximately 50 <br />tons empty and will provide rurge storage capacity of 300 tons, will be eretted using a mobile <br />crane and mounted on the previously corutructed foundation structures. <br />• <br />ACZ /nc. • P.O. Bax 774018 • Steamboat Springs, Colorado 80477 • (30318 79-62 60 <br />
The URL can be used to link to this page
Your browser does not support the video tag.