Laserfiche WebLink
Apri/ 1992 MR-19 Pneumatic f:oa/ Drying lnsta/ration • Paye ~ i <br />• TABLE OF CONTENTS <br />PaEe No. <br />INTRODUCTION ................................................... i <br />2.03 LEGAL, FINANCIAL, COMPLIANCE AND RELATED INFORMATION ... 1 <br />2.04 ENVIItONMENTAL RESOURCES ................................. 2 <br />2.05 OPERATION AND RECLAMATION PLANS ......................... 2 <br />INSTALL FOUNDATION STRUCTURES ........................... 2 <br />ERECT HOPPER STRUCTURE .................................. 2 <br />INSTALL CYCLONE DRYER .................................... 4 <br />ERECT PNEUMATIC PIPELINE, WALI{WAY AND SUPPORT <br />STRUCTURES .......................................... 4 <br />INSTALL MODULAR FEEDER AND PUMP SYSTEMS ................ 4 <br />SYSTEM OPERATION AND MAINTENANCE ...................... 4 <br />RECLAMATION AND CLOSURE ................................ 6 <br />POSTMINING LAND USE ...................................... 6 <br />PROTECTION OF HYDROLOGIC BALANCE ...................... 6 <br />• 2.08.4 REVISIONS TO A PERMIT ...................................... ' 6 <br />3.0 BONDING REQUIREMENTS ...................................... 6 <br />LIST OF FIGURES <br />Fieure No. Description P e No. <br />19-1 Pneumatic Coal Drying System -Conceptual Design .......... 3 <br />19-2 Pneumatic Coal Drying System -Trailer Detail .............. 5 <br /> <br />ACZ lnc. • P.O. Box 774018 • Steamboat Springs, Colorado 80477 • (30318 79-62 60 <br />