Laserfiche WebLink
i t <br />Febnlary 1992 Technica/ReWslon TR-12 • 3 <br />The bonding calculations are swctured to address similar reclamation requirements in four general areas as <br />described on Page 2 and summarized on Page 6 of the bonding estimate. The general azea designated as the <br />"Mine Facilities Area' includes those areas associated with the mine facilities, coal preparation plant, coal <br />stockpile area, truck tunnel and scales, and Ponds 1, 2, and 5. Material movement volumes for pond <br />reclamation are included in the cumulative backfill volume shown on Page 9 and grading, topsoil replacement, <br />and revegetation of pond areas are reflected in the volumes/aaeages shown on Pages 9, 10, and 11 of the <br />bonding calculations. Ponds 3 and 4 are specifically designated in the bonding calculations only because the <br />associated disturbance area and reclamation requirements are distinct from the other designated general <br />disturbance categories. <br />Similarly, reclamation of [he Pond Ll and LZ areas is addreued under the general designation of "Loadou[ <br />Area". Backfdl volumes required far reclamation of these ponds are specifically identified on Page 18 of the <br />bonding calculations and grading, topsoil replacement and revegetation requirements for the pond areas are <br />included under the general "Loadou[ Area" category on Pages 18, 19 and 20. <br />Since reclamation costs for all of the referenced pond swctures aze inc]uded in the previously submitted <br />bonding calculations as described above, additional documentation is not necessary to satisfy Condition 4 for <br />abatement of [he NOV. EFCI has updated and revised the legal description of the Southfield Permit area [o <br />address Condition 3 Cor abatement of the NOV. The revised Exhibit A to the bond form is included in this <br />technical revision package. <br />• <br />C~ <br />ACZ /nt. • P.O. Bar 714018 • Steamboat Spnn~ Colorado 80•!77 • (303)879-6260 <br />