Laserfiche WebLink
• Tabla 4.3-t Sa cont. Page 2 <br />Semi <br />quarterly Annual Annual <br />Sampling Sampling Sampling <br />Si[e Aquifer Requirements Requirement Requirement Comments <br /> <br />• <br />J-1 Alluv <br />P-1 Alluv <br />P-3 Lewis Shale <br />P-5 2nd WSS <br />P-S 3rd WSS <br />Coy Al1w <br />GP-1 DR <br />GP-2 KLM <br />GP-3 HI <br />GP-4 KLM <br />GP-5 DR <br />GPI DR <br />GP-7 HI <br />GP-8 KLM <br />GP-9 3rd WSS <br />GLUX-1 tst WSS <br />GMP-1 HI <br />Water Level List C <br />Elevation <br />" List C <br />" List C <br />" List C <br />" List C <br />" List C <br />" List C <br />" List C <br />" List C <br />" List C <br />" List C <br />" list C <br />" List C <br />" List C <br />" List C <br />" List E <br />" List D <br />List B <br />List B <br />List B <br />List B <br />List B <br />List 8 <br />List B <br />List B <br />List B <br />List B <br />List B <br />List B <br />List B <br />List B <br />List B <br />List B <br />List B <br />Mate: Annual sampling (List B) generally conducted in September/October. The additional semi-annual <br />sampling (List C, D'o~ E) is conducted in May/June. See Table 4.8-13 for parameters list. <br />PK-~I <br />4245 X99$ <br />P~~AY. ~ 3 -- _ <br />