Laserfiche WebLink
• OUTDATED MONITORING SCHEDULE <br />Table 4.8-11. Operational Surface Water Monitoring Schedule <br />(Historic -see Table 4.8-11 a for current monitoring schedule in disturbed areas) <br />Site Sampling Parameter to <br />Name NPDES Gulch Frequency be Sampled <br />S-1 - Flume Quarterly (2) LIST A and A-1 <br /> plus stage <br />S-3 - Pyeatt Quarterly (2) LIST A and A-1 <br /> plus flow <br />S-14 001 Johnson As spec'rfied in the LIST A, plus slow <br /> Colorado Wastewater <br /> Discharge Permit <br /> CO-0032115 (1) <br /> Twice Annually LIST A-1, plus flow <br />S-5 002 No-Name As spec'rfied in the LIST A, plus flow <br /> Colorado Wastewater <br /> Discharge Permi[ <br /> CO-0032115 (1) <br />• S <br /> Twice annually LI <br />T A-1, plus flow <br />5-11 005 Coyote As specified in the LIST A, plus flow <br /> Colorado Wastewater <br /> Discharge Permit <br /> CO-0032115 (1) <br />S-12 003 East (1) LIST A, plus flow <br /> Buzzard <br />S-13 006 West (1) LIST A, plus flow <br /> Buzzard <br />S-15 008 Ute (1) LIST A, plus flow <br />- 007 Impound- (1) LIST A, plus flow <br /> men[ H <br />(1) Acidity only monthly frequency <br />(2) Quarterly, until disturbed, at which time the sampling frequency will be as specified on page <br />4-239a. Further, once the sample point is included in the Colorado Wastewater Discharge Permit, <br />sampling will be as specified in our NPDES permit. <br />4-239a '~ ~~ <br />~EVISiON ' ~P('^V <br />~ DATE ~~ <br />