My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE113232
DRMS
>
Back File Migration
>
Permit File
>
200000
>
PERMFILE113232
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:09:25 PM
Creation date
11/24/2007 10:21:27 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1981154
IBM Index Class Name
Permit File
Doc Date
11/6/1981
Doc Name
14 SAN MIGUEL CNTY PITS OUR FN 81-154 & 81-214 THROUGH 81-226
From
MLR
To
PAUL SALE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
~rnii r,i cou)~+ni,q i,~~.~~i.i.u ~:..,~ III III'111111111111 <br />DEPARTMENT OF NATURAL RESOURCES <br />D. Monte Pascoe. Executive Director <br />MINED LAND RECLANIATION <br />d23 Centennial Building, 73735herman Street <br />Denver, Colorado 80203 Tel. (303) 866-3567 <br />David C. Shelton <br />Director <br />Novcnibcr. 6, 1981 <br />Mr. Pa u1 Sale <br />San Miguel County Road 6 Bridge Supervisor <br />P.O. Hox 426 <br />Norwood, Colorado 81423 <br />Re: 14 San Miguel Counts Pits <br />Our File Nos. 8Z-154 and 81-214 through 81-776 <br />Dear Mr. Sale: <br />,~/-~s~ <br />S have reviewed your. reply to mu adequacy letter on the application for mining <br />and reclamation permits for the 19 San Miguel County Pits captioned above. <br />You have answered the great majority of my questions in this matter, but I <br />still have a few points of clarification. For your convenience, I will use <br />the exhibit letter and number references from mu letter of September 4, 1981. <br />Any questions not mentioned again are considered answered. <br />,Are the certified mail return receipts sent to us in this Last mailing proof <br />(~of notification of all adjacent landowners for aI1 I4 pits? <br />Exhibit B <br />1. Please clarify your p.Zans for the topsoil stockpiles just a bit more. Z <br />kpresume you do intend to olant them with a perennial grass cover crop as <br />appropriate (as I suggest=d). <br />3. Now will the San Miguel River be protected from increased sediment loads <br />~/ due to the mining operati~~n in Pit No. 13? Wi11 berms be placed between areas of <br />/~ disturbance and the river? <br />F.xhi hit (' <br />2. Your maps are adequate for the purposes of these permits (especially <br />now Chat most of my adequacy questions relating to the maps have been answered). <br />F.xhihir n <br />~(~3. a. How will the San Mi~TUel River be protected from increased sediment loads <br />/` due Co the mining of Pit t7o. 13? <br />F.xhihir F <br />d. Are the seeding rates given for the 14 reclamation seeding mixes by the <br />,X S.C.S. drilled or broadca~:t rates? <br />
The URL can be used to link to this page
Your browser does not support the video tag.