My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE113227
DRMS
>
Back File Migration
>
Permit File
>
200000
>
PERMFILE113227
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:09:25 PM
Creation date
11/24/2007 10:21:21 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981012A
IBM Index Class Name
Permit File
Doc Date
12/11/2001
Section_Exhibit Name
EXHIBIT 28 BOND CALCULATIONS
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
72
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimating Software <br />• BULLDOZER WORK <br />Task # : 23c Slate :Colorado PermiUjob# : C-81-012 <br />Date : 08/08/2001 County :Las Animas Abbreviation :none I <br />User : JNB Site :New Elk Mine Filename : C012-23c <br />Agency or organization name :Colorado Division Of Minerals And Geology <br />Permit or other job action :2001 Midterm <br />Task description :Grade 8,910 ft. Type D ditch <br />Basic machine :Cat D4C Series 3 - 4P Horsepower : 80 <br />Blade type :Power Angle Tilt <br />Attachment no. 1 : ROPS Cab Shift basis : 1 per day <br />Attachment no. 2 :NA <br /> Data source : (CRG) <br /> Utilization <br />Cost Breakdown : Ownership cost hour : $10.79 NA i <br />Operating cosUhour : $19.56 100 <br />Ripper op. cosVhour : $0.00 NA <br />Operator cosUhour : $27.99 NA <br />Total unit cost hour : $58.33 Total fleet cosUhour : $58.33 <br />.~~ci~j 4'?,~p .i';~'.'p r~~v,,-+'~°t n S'~i~:;'~. .;• w:~ i~J1§An Y'a ~~ err +~'.~+fi;~L.rx * ~', <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume : 4,392 CCY factor : 1.125 volume : 4,941 LCY ii <br />Source of estimated volume :Permit Exhibit 28-56 ~~ <br />Source of estimated swell factor : Caterpillarliandbook, 28th Edition <br />HOURLY PRODUCTION <br />Average push distance : 50 feet <br />Unadjusted howdy production : 300.0 LCY/hr <br />Material consistency description <br />Compacted fill or embankment <br />Average push gradient <br />Average site altitude <br />Material weight <br />Weight description <br />Earth -Dry packed <br />0.00 % (pos) <br />7,400 feet <br />2,550 Ibs/LCY <br />Fleet size : 1 Dozers) <br />Unit cost : $0.397 /LCY <br />Jbb Condition Correction Factors <br />Operator skill <br />Material consistency <br />Dozing method <br />Visibility <br />Job efficiency <br />Spoil pile <br />Push gradient <br />Altitude <br />Material weight <br />Blade type <br />Net correction <br />Adjusted unit production <br />Adjusted fleet production <br />Total job time <br />Total job cost <br /> <br />0.75 (avg.) <br />0.90 (Gal HB) <br />1.00 (gen.) <br />1.00 (avg.) <br />0.83 (fshiff/day) .~ <br />1.00 (doz-oc) <br />1.00 (Gat HB) <br />0.97 (Cat NB) <br />0.90 (Cat HB) <br />1.00 (PAT) <br />0.49 <br /> <br />147.00 LCY/hr <br />147.00 LCY/hr <br /> <br />33.81 Hours <br />$1,961 ~ <br />y <br /> <br /> ,~~~ r~~ z <br />
The URL can be used to link to this page
Your browser does not support the video tag.