Laserfiche WebLink
• <br />• <br />PROJECT IDENTIFICATION <br />Agency or orgai <br />Task #: 10c <br />Date : 03r21/2002 <br />User: JHB <br />CIRCES Cost Estimating Software <br />TRUCK/LOADER TEAM WORK <br />tization name :Colorado Division O(Minerals And Geology <br />State :Colorado PenniUjob#:C-81-012 <br />County :Las Animas Abbreviation :none <br />Site :New Elk Mine Filename :C012-fOc <br />Permit or other job action :2001 Midterm <br />Task descdption :Haul raw coal storage footprint to Development waste pile <br />HOURLY EQUIPMENT COST Shin basis : 1 per day <br />Total work team cost hour : $608.84 <br />....,,. <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume: 5,880 CCY factor: 1.035 volume: 6,088 LCY <br />TruclNoader team -Truck : Genedc 12-18 cy, 6x4 <br />-Loader :CAT 966E S.2 std. IiR (15 <br />Support equipment -Load area :Cat D8R - 8SU <br />-Dump area : Ca[ D8R - 8SU <br />Road maintenance -Motor grader : A <br />-Water truck :Water Tanker, 2,500 Gal. <br />Cost Breakdown : ruck/LOader Work Team <br />Truck Loading Tool Support Equipment <br />Load Area Dump Area Road Maintenance Equipment <br />Motor Grader Water Truck <br />Import data filename : truck2 loader dozer dozer NA misctruk <br />Utilization-machine : 100 100 100 100 NA 25 <br />-Ripper attachment : NA NA NA NA NA NA <br />Ownership cosf/hour : 820.12 830.78 843.04 $43.04 NA 87.65 <br />Operating cost/hour: $26.72 $30.74 $65.98 $65.98 NA $2.49 <br />Ripper op. cosUhour : NA NA 80.00 $0.00 NA NA <br />Operator cosUhour: 823.61 $27.99 827.99 $27.99 NA $23.61 <br />Unit subtotals : 810.45 $89.51 8137.02 $137.02 NA 833.74 <br />Number of units : 3 1 1 1 0 1 <br />Group subtotals : Work : 8300.86 Support : 8274.03 Maintenance : $33.74 <br />Descr.: Coal <br />Source of quantity take-0H :Permit Map 13- 1 R. thick <br />Source of estimated swell factor :Caterpillar Handbook <br />Mated8l purchase cost : 80.00 /LCY Total cost : $0 <br />HOURLY PRODUCTION <br />Truck Caoacitv ; <br />Truck Payload (weight) Basis : Truck Bed (volume) Basis <br />Material weight : 1,600 pounds/LCY Struck volume <br />• bituminous, raw Heaped volume <br />Rated payload : 48,000 pounds Average volume <br />Payload capacity : 30.00 LCY Adjusted capacity <br />Final adjusted truck capacity based on specific number of loader passes <br />sheet 1 of 2 <br />12.00 LCY <br />18.00 LCY <br />15.00 LCY <br />15.00 LCY <br />14.85 LCY <br />Loading Tool CaoaciN: ob Condition Corrections : Site altitude (R.) : 7,400 <br />Rated capacity (nom. heaped) : 4.500 LCV Truck Loader Source <br />• <br />Descr.:Other- rock/din mixtures (100-120% J Altitude adj.: 1.000 1.000 (Cat HB) <br />Bucket fill factor : 1.100 Job efficiency : 0.830 0.830 (user) <br />Adjusted bucket capacity : 4.950 LCY Nel correction : 0.830 0.830 <br />.. ..... ... <br />.c'xk Z!J'fq /Qevrs~ tf/o~ <br />