sheet 1 of 2 <br /> CIRCES Cost Estimating Software <br />• TRUCK/LOADER TEAM WORK <br />PROJECT IDENTIFICATION <br />Agency or organization name :Colorado Division Of Minerals And Geology <br />Task # : 10b State :Colorado Permit/job # : C-81-011 <br />Date : 03/082002 County :Las Animas Abbreviation :none <br />User: JHB Sile :New Elk Mine Filename:CO}2-f06 <br />Permit or other job action :2001 Midterm <br />Task description :Haul NE coal stockpile to development waste pile <br />,:. <br />HOURLY EQUIPMENT COST ~ Shiff basis : 1 per day <br />Truckfloader team -Truck :'Generic 12-18 cy, 8x4 <br />-Loader :CAT 968E 5.2 std. IiR (15 <br />Support equipment -Load area :Cat D8R - 8SU <br />-Dump area :Cat D8R - 8SU <br />Road maintenance -Motor grader :NA <br />-Water truck :Wafer Tanker. 2,500 Gal. <br />• <br />Cost Breakdown : ruck/Loader Work Team <br />Truck loading Tool Support Equipment <br />load Area Dump Area Road Maintenance Equipment <br />Motor Grader Water Truck <br />Import data f lename : lruck2 loader dozer dozer NA misctruk <br />%Ulilization-machine: 100 100 100 100 NA 25 <br />-Ripper attachment : NA NA NA NA NA NA <br />Ownership cosUhour: $20.12 $30.78 $43.04 $43.04 NA $7.65 <br />Operating cosUhour : $26.72 $30.74 $65.98 $65.98 NA $2.49 <br />Ripper op. cost/hour : NA NA $0.00 $0.00 NA NA <br />Operator costJhour : $23.61 527.99 $27.99 $27.99 NA $23.61 <br />Unit subtotals : $70.45 $89.51 $137.02 $137.02 NA $33.74 <br />Number of units : 3 1 1 1 0 1 <br />Group subtotals : Work : $300.88 Support : $274.03 Maintenance : $33.74 <br />Total work team cosdhour : $608.64 <br />MATERIAL QUANTITIES <br />initial Swell Loose <br />volume: 4,745 CCY factor: 1.185 volume: 5,623 LCY <br />Material weight : 1,600 pounds/LCY Struck volume : 12.00 _LCY <br />Descr.:Coal-bituminous, raw Heaped volume: 18.00 LCY <br />Rated payload : 48,000 pounds Average volume : 15.00 LCY <br />Payload cepaciry : 30.00 LCY Adjusted capacity : 15.00 LCY <br />Final adjusted truck capacity based on specific number of loader passes : 14.85 LCY <br />Source of quantity take-off :Map 11; 128,125 sq.ft x 1 R. lh. <br />Source of estimated swell factor :Caterpillar Handbook <br />Material purchase cost : $0.00 /LCY Total cost : $0 <br />HOURLY PRODUCTION <br />Truck CaoaciN <br />Truck Payload (weight) Basis : Truck Bed (volume) Basis <br />Loadlng Tooi CaoaclN : ob Condltior <br />. Rated capacity (nom. heaped) : 4.500 LCY <br />Descr.:Other- mcWdirt mixtures (100-120% J Altitude adj. <br />Bucket ill factor: 1.100 Job efficiency <br />Adjusted bucket capacity : 4.950 LCY Net correction <br />Site altitude (tl.) <br />Truck Loader <br />1.000 1.000 <br />0.830 0.830 <br />0.830 0.830 <br />EX~t Z8' - 17 IQev(S ercQ ~--o Z- <br />