sheet 1 of 2 <br /> CIRCES Cost Estimating Software <br />• TRUCK/LOADER TEAM WORK <br />PROJECT IDENTIFICATION <br />Agency or organization name :Colorado Division OI Minerals And Geology <br />Task # : 10a State :Colorado PenniUjob # : C-81-012 <br />Date : OA/07l2001 County :Las Animas Abbreviation :none <br />User: JHB Site :New Elk Mine Filename:C012-10a <br /> <br />Rated payload : 48.000 pounds Average volume : 15.00 LCY <br />Payload capacity : 30.00 LCY Adjusted capacity: 15.00 LCY <br />Final adjusted truck capacity Dosed on specific number of loader passes : 14.85 LCY <br />Loading Tool CaoaciN <br />• Rated capacity (nom. heaped) <br />Descr.:Other- rocWdirt mixtur <br />Bucket fill factor <br />Adjusted bucket capacity <br />Permit or other job action :2001 Midterm <br />Task description :Haul SE coal <br />HOURLY EQUIPMENT COST <br />tockpile footprint to Bevel. waste pile <br />Shift basis : 7 per day <br />Trucklloader team -Truck : Genedc 12-18 cy, 6x4 _ <br />-Loader :CAT 966E S.2 std. lilt (1999) <br />Support equipment -Load area :Cat D8R - 8SU _ <br />-Dump area :Cat D8R - 85U <br />Road maintenance -Motor g2der : A <br />-Water truck : Water Tanker 2.500 Gal. <br />Cost Breakdown : ruck/Load <br />Truck er Work Team <br />Loading Tool Support Equipment <br />load Area Dump Area Road Maintenance Equipment <br />Motor Grader Water Truck <br />Import data filename : truck2 loader dozer dozer NA mischuk <br />%Utilization-machine: 86 100 fOD 100 NA 25 <br />-Ripper attachment: NA NA NA NA NA NA <br />Ownership casUhour : 820.12 $30.78 $43.04 $43.04 NA $7.65 <br />Operating cosUhour: $23.06 $30.74 $65.98 $65.98 NA 82.49 <br />Ripper op. cost/hour : NA NA $0.00 $0.00 NA NA <br />Operator cost hour: $23.67 $27.99 $27.99 $27.99 NA $23.61 <br />Unit subtotals : $66.79 $89.51 8137.02 $137.02 NA $33.74 <br />Number of units : 3 1 1 1 0 7 <br />Group subtotals : Work : $289.88 Support : $274.03 Maintenance : $33.74 <br />Total work team cosUhour : $597.65 <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume: 7,212 CCY factor: 1.185 volume: 8,546 LCY <br />Source of quantity take-off :Permit Map 13- 2 h. thick <br />Source of estimated swell factor :Caterpillar Handbook <br />Material purchase cost : $0.00 /LCY Total cost : $0 <br />.. . <br />HOURLY PRODUCTION <br />Truck CaoaciN <br />Truck Payload (weight) Basis : Truck Bed (volume) Basis <br />Material weight: 1,600 pounds/LCY Struck volume: 12.00 LCY <br />Descr.:Coal-bituminous, raw Heaped volume: 18.00 LCY <br />ob Condition Corrections <br />4.500 LCY Truck <br />°s (100-120°o J Altitude adj.: 1.000 <br />1. f00 Job efficiency : 0.830 <br />4.950 LCY Ne[ correction : 0.830 <br />~xk ~_~ <br />Site altitude (ft.) : 7,400 <br />Loader ~ource <br />0.8301(1 shilUday) <br />0.830--J <br />~Zers~ ~~° z <br />