Laserfiche WebLink
<br /> <br />TIME (DAYS)1 I <br />30 60 90 120 150 <br />REMOVAL OF STRUCTURES I N/A <br />AND FACILITIES <br />REMOVAL OF COAL WASTE <br />MATERIAL <br />BACKFILLING AND GRADING <br />REDISTRIBUTION OF TOPSOIL <br />REVEGETATION TO APPROPRIATEZI I <br />LAND USE `` <br />PROTECTION OF HYDROLOGIC <br />BALANCE <br /> <br />1) STARTING DATE OF RECLAMATION SEQUENCE IS DEPENDENT ON NEGOTIATIONS WITH THE D&RG <br />RAILROAD AND APPROVAL FROM CMLRD, <br />2) REVEGETATION WILL DEPEND ON TIME OF YEAR, <br />FIGURE 2 <br />TOWN LOADOUT FACILITY <br />RECLAMATION TIMETABLE <br />