Laserfiche WebLink
PAR RESPONSE <br />Revegetation to Appropriate Land Use <br />The regraded and topsoiled area will then be seeded with the seed <br />mixture presented in Table 1, Town Loadout Facility Seed Mixture. A <br />straw mulch will be applied at the rate of two (2) tons per acre on the <br />seeded areas and crimped into the topsoil. As previously discussed, <br />the railroad siding will be established as an industrial site as the <br />post-mining land use. <br />The Denver and Rio Grande Railroad has previously agreed to the <br />post-mining land use of industrial site. <br />Protection of Hydrologic Balance <br />As indicated on Figure 1, Town Loadout Facility Location, Empire Energy <br />has installed a surface water sediment control system to gather and <br />retain runoff from the facility area. In order to protect the <br />• hydrologic balance, the drainage and sediment control system will remain <br />intact until all the coal material is removed from the site. <br />Reclamation Timetable <br />Time schedule for all proposed reclamation activities is presented on <br />Figure 2, Town Loadout Facility Reclamation Timetable. <br />r <br />-5R- <br />