Laserfiche WebLink
<br /> <br />RIDER TO MINING PERMIT <br />Permit Date: July 10, 1995 <br />Permit No: M-95-034 <br />The following additional stipulations and conditions form an integral part of <br />the foregoing permit: <br />Stipulation No. Ol <br />THE MAXIMUM DISTURBANCE ALLOWED AT ANY ONE TIME IS 3 ACRES. <br />MINED LAND RECLAMATION BOARD <br />COLORADO DEPARTMENT OF NATURAL RESOURCES <br />MICHAEL B. LO G <br />Division Director <br />MBL/TAS/amm <br />2556G <br />