Laserfiche WebLink
<br />,,~. <br />iii iuiiiiiniii iii <br />999 <br />October 7, 1997 <br />Colorado Mined Land Reclamation Board - "-' - " <br />Division of Minerals and Geology <br />1313 Sherman Street, Room 2I5 OCI ~ q 1991 <br />Denver, Colorado 80203 <br />. w..... ..~ ..x,10' J..o G: l:i,- J~J. <br />Re: Hall Irwin Construction Co. <br />Section 36, T1N-R67W <br />Section 31, T 1 N-R66W <br />Dear Sir: <br />Batas Oil, Inc. received a copy today of the Public Notice from Tuttle Applegate, <br />Inc. regarding a request for permit for mining operations on the referenced lands. This <br />letter is intended to address Batas Oil, Inc.'s concern and interest with Hall Irwin <br />Construction Co.'s proposed operations. Enclosed are three Oil and Gas Leases covering <br />the property, the first one is dated November 12, 1990 between Wilma V. Moore and <br />Louis J. Gallery, the second lease is dated May 30, 1991 between David D. Dersham and <br />Batas Oil, [nc. and the third lease is dated May 31, 1991 between Bernice Larson and <br />Batas Oil, Inc. Under the Oil and Gas Leases, Batas has the right to explore for, drill and <br />produce oil and gas along with all rights and easements necessary for conducting <br />operations. Within the last year Batas has drilled three wells in the Northeast Quarter of <br />Section 36 that have proven to be very productive wells. Our plans are to continue <br />drilling one well at a time within the geological trend that seems to be running in a <br />southeasterly direction. Our fourth quarter drilling plans include two additional wells <br />scheduled to be drilled within the subject property. Enclosed are survey plats for the well <br />site locations. <br />Batas will require approximately three acres for its drilling and completion <br />operations that are tentatively scheduled for November. To maintain operation on the <br />wells, Batas will need seventy-five feet surrounding each well with ingress and egress. <br />The desired road width to service each well and tank battery facility is forty feet. The <br />tank battery facility will encompass an area of approximately 100 feet by 150 feet. A <br />fifty foot wide strip will be used to construct the flowline from each well to the tank <br />battery facility. After the line is constructed the easement can be reduced to twenty five <br />feet. Either Duke Energy or Vessels Pipeline Company will run a pipeline to our facility <br />to transport the gas. <br />2500 WEST 29TH STREET • GREELEY, CO 80631 • PHONE (970) 330-5699 FAX (970) 330-5788 <br /> <br />