My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE113044
DRMS
>
Back File Migration
>
Permit File
>
200000
>
PERMFILE113044
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:09:16 PM
Creation date
11/24/2007 10:12:39 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2000154
IBM Index Class Name
Permit File
Doc Date
5/2/2001
Doc Name
H H STONE QUARRY 3 FN M-2000-154 2ND ADEQUACY REVIEW
From
H H STONE
To
DMG
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />iii iiiiiiiiniiiiii <br />H & H STONE <br />PO Box 162 <br />Dove Creek, CO 81324 <br />Phone (970) 677-2767 Received <br />Fax (970)677-2921 <br />IR~C~9@,'E® MAY 0 2 2001 <br />April 30, 2001 <br />MAY 0 ~ 1001 Durango Field Office <br />State of Colorado Dhrblon of Minerals 8 Geology <br />Division of Minerals&Geology ~iYisionoflVlineralsand&auluy~ <br />Durango Field Office <br />701 Camino Del Rio Rm. 125 <br />Durango, Co. 81301 <br />RE: H & H Stone Quarry #3 ~a!r~`~n~ ,` ~, i ~ .~~ <br />File No. M-2000-154 ~ ~o ii^ ~'~ FFe r <br />Second Adequacy Review I ~^/n~ ry/~.yy~~ /{/ <br />G L~.~.~ /r l~ ZWN -~,~~ <br />Deaz Mr. Shuey, ~P`j ~;~~.t/ro~t ~up~#~ <br />©r~ a~lPl~c.. <br />1. For Adequacy Issue #1 Maps - Amended and enclosed. <br />6. We will commit to topsoil stockpiles that have no greater than 3:1 slopes. <br />12. We will commit to use of 1 ton per acre certified weed free straw of hay <br />mulch crimped into the surface after seed application. <br />13. The drainage will not be touched and stockpiles and sediment ponds will be <br />built just north of this drainage. The reason the representative said these <br />things are because at first it was some of the options discussed before <br />fmalizing paper work. But we will do what ever is necessary from the State. <br />16. 1 looked over all figures in cost estimation -they all look OK. <br />17. As I stated before, we will not go across drainage at south end of Quarry, <br />although Quarry boundary is beyond drainage in certain areas. <br />We will also modify Exhibit M. so all materials needed for reclamation will <br />be hauled across drainage in bucketed equipment and not pushed into <br />drainage. <br />~~ <br />~~~ <br />
The URL can be used to link to this page
Your browser does not support the video tag.