Laserfiche WebLink
FLJrJ I:)aTE: i'•-Mar-88 FILE: ROfJD4 Revised Plarch 14, 1988 <br />8 hours/tlav <br />Flours reguired(volume production) 7.7.17 hours <br />Cost/hour <br />Scraper 682.42 <br />Total Cost (Hours * F/houri 3'.,234.39 <br />TOTAL TOF'SOILING COST 3'.2'4.~9 <br />RE'JEGETATIOfJ COSTS <br />Ooerat.ing Assumoti.ons <br />Acreage _. 66• acres <br />Egui^ment <br />Jghra Deere 4ia1E Tractor wi.t.h <br />disc. drill. crimper-. G~ mu].cr~~er <br />N[.rmber of gasses r-equi r-ed 5 passes <br />Fertilize, disc, rJril.l, mulch. crime <br />f-'roduct.ign 4 a.cres!f~~our <br />Uoer-atino and Material Costs <br />Operat i can <br />Flo[.rrs rear.rir-ed _. _7 hours <br />(acres / production ~ 3k of passes) <br />Cost/hour 26.45 <br />• T 187 <br />94 <br />otal Operation . <br />Materials <br />Seed Mi:; 374. B1 ;'acre <br />{gee table 4(d)i <br />Mulch <br />Rate ~. G~? tgnsi acre <br />Cost/t.on 3,,Ci.00 !ton <br />TOTAL MULCH 37.~a_a,iaia ;acre <br />Fertilizer S]CaO.OU iacre <br />Total Mat.eri. al s <br />Seed 3198.99 <br />Mulch ~266.OC~ <br />Fertilizer 3266.iu~ <br />70TAL MATERIALS 37T0.99 <br />TOTAL REVEGETATION COSTS 381 °. 93 <br />Cgrrectigr~ for opssibe seedin^ failure 1.~r5 <br />TOTAL CORRECTED REVEGETATION COSTS 3°59.68 <br />~OTAL NORTHGATE RECLAMATION COSTS <br />Tgpsoil~.ng 33.24.39 <br />Reveoetatipn 38~9.8g <br />H-6 <br />