Laserfiche WebLink
RUN DATE: 1•-Mar-L=s f-ILE: ErOPJCi4 Revised P'larCh 14, 1988 <br />Grader I169.~78.00 <br />• TOTAL. HACb::FILLING COST #2?7.80. 29 <br />LEVEL_IhJG AND GF~ADIfJG COSTS <br />Ooerat.ino Assumot.ians <br />Gradi.n^ costs are hated or. a breakdown Getween <br />those areas reoui.rir~o bath dozer and orader time <br />and those areas where a arader shouJ.d be su.+ficient. <br />Enr_uoment. <br />Gat ~9L dozer <br />Cat. 7.4G motor arader <br />AcrFaoe. <br />Areas reau~r~nn both dozer and ^r~~der <br />Sediment. Farrds 4. V1 ar_res <br />Toad=(nn-=_.ite) 7. bb acres <br /> TOl-AL 11.6? acres <br />Arras renu~rin^ rneto~- ar-ceder or~ly <br />F_;;eae•at~or~ __.lir acres <br />Horseshoe D~_rmo .•'.4 acres <br />Stoctieiles B.~f• acres, <br /> TOTAL ?=.8~• acres <br />Goeratino Costs <br />Eouioment time <br />Dozer 2. 7C hourslacre <br />• <br />Grader 1.00 hourslacre <br />Hours reoui.red <br />Dozer _~.ir4 hours <br />Grader- 85. ~0 hour=• <br />Cast oer hour <br />Dozer t1~0.04 !hour. <br />Grader <br />Rental x'4.11 :hour <br />Operation 118.4? !hour <br />Operator 10.44 !hour <br /> TOTAL GRADER ff 73. i:~ ! hor_rr <br />Total Cost (I-~aurs ~ !hour? <br />Da: er <br />Gr-a.der <br />TOTAL LEVELING AND GRADING COST <br />TOF'SOILING COSTS <br />Ooeratino Assumptions <br />Volume <br />Depth <br />Acreage <br />Eouioment <br />Cat c'7 Sr=roper <br />1~.0ir inches <br />100.00 acres <br />ioush-pull? <br />X4.615.16 <br />56.24~.~1 <br />~11.05B.~7 <br />161.~~=.= LCY <br />Ooara.tinn Co_t= <br />H-2 <br />