Laserfiche WebLink
KEVIN MILI,EN <br />Birtdate: 1-10-54 <br />Education <br />Sierra College, <br />Experience <br />Gates & Fox Co., <br />Hecla Mining Co. <br />Idardo Mining Co <br />Gates & Fox Co., <br />California <br />Inc., Project Engineer, 1978-present <br />Miner, Feb. 1976-June 1976 <br />., Miner, 1975-76 <br />Inc., Miner 1974-75 <br />Representative Projects <br />Mr. Miller worked on the Bear Swamp Project for Gates & Fox <br />in 1971 and was a miner on the Yellowtall Dam project in <br />1974-75. Kevin is a Project Engineer at the J-D 5 Mine in <br />Colorado. As Project Engineer, Kevin is responsible for <br />engineering activities at the mine. This includes surveying, <br />mine ventilation, and radon monitoring. Additional duties <br />include background radiation monitoring and air particulate <br />sampling. <br />