1 <br />1 <br /> <br />EXHIBTT E S 1~ <br />RECLAI~IATIOI~i PLAN <br />IDELTA PAVING G1iA~~L PIT <br />The areas to be mined will be reclaimed in phases as the [Wining pronresses. The area south of the <br />processine site will be mined ut five Phases, four of which are contiguous. The fwal exterior of the <br />contieuous phases will be reclaimed after mining has been completed within the Phase. Those <br />sides of a Phase which join another Phase will be sloped at 2 to 1 and betmed for safety. <br />The final exterior sides will be sloped at 3 horizontal to 1 vertical from the existing ground level to <br />the bottom of the excavation when mining has been completed along the side. The slopes will be <br />seeded in the fall followin, the completion of the mining. <br />Final slopes and disturbed area will be covered with 4 to 6 inches of topsoil. The disritrbad areas <br />attd slopes will be seeded with the followins seed mixture: <br />Species Lbs/Acre <br />Biue Granta 0.4 <br />Cralleta grass 0.5 <br />Ltdian Riceerass 1.~ <br />Sand Dropseed 0.1 <br />Sainfoin 1.U <br />A grass hav mulch will be applied at a rate of 4000 pounds per acre. <br />Pit Phase II (between the drainage ditch aztd the River, see Exhibit C) will be sloped 3 to 1 and <br />not seeded or topsoiled. The River flows over this area every few years when there is high ntnoff <br />This Phase will be leh for the River to reclaim b_v filline in the mined area with eravel and <br />sediment over a period of a few vears. <br />1 <br />1 <br /> <br /> <br />1 <br />1 <br />The remainder of the mined area wili be left as four ponds with surface areas rauging in size from <br />2.6 to 35.2 acres. See Exltibit F. <br />The haul road will be left in place to provide permanent access to the processine site. The portion <br />of fire processing site located on the Delta Paving LLC property will he ]eft as a permanent plant <br />site for a concrete and asphalt plant. The portion of the processine site on Frazier propem (5.9 <br />acres) will be topsoiled and seeded. <br />Final reclamation of the site should be completed within 2 to years after al] material has been <br />mined out. This will allow three ~rowine seasons fitr the veee[ation to establish tiself. <br />The post muting land use of the mined areas will be private recreation and wildlife habitat. <br /> <br />