Laserfiche WebLink
-3- <br />d~emrured: <br />b) The Board will alter the lands to perform reclamation only if the Board has <br />i. that reclamation required by law to have bear performed upon sudr lands has <br />not bear perfonned, and <br />ii. that permit revocation proccedings described in the Act or similar provisions <br />of subsequent laws, if any, have bear initiated. <br />c) The Division, ailing for the Board, will eater lands to respard to an emergency wily <br />where the Divisicn detemtines that any ofthe conditions of Construction Material Rule 8.4.2 exist. <br />~ The additional conditions set forth in the attached rider, if any, are hrcotporated herein by <br />reference. <br />/_/ a) Rider is attached. <br />/ XX / b) No rider is attached. <br />MINED LAND RECLAMATION BOARD <br />COLORADO DEPARTMENT OF NATURAL RESOURCES <br />MICHAEL B. L <br />Division Director <br />