Laserfiche WebLink
CIRCES Cost Estimating Software <br />PROJECT IDENTIFICATION <br />Task # : 003 State :Colorado Pemtitfjob# : M-2004-009 <br />Date : 05x10/2004 <br /> County :Weld Abbreviation : none <br />User : GRD <br /> Site :Turnpike Mining Resource Filename : M009-003 <br />Agency or organization name : CO. DMG <br />Permit or other job action : New Application <br />Task descdpflon : Backfilling and slope grading <br />:. <br />HOURLY EQUIPMENT COST ,..: ;: <br /> Basic machine :Cat D8R Series II - 8SU Horsepower : 310 <br /> Blade type :Semi-Universal <br /> Attachment no. 1 :ROPS Cab Shift basis : 1 per day <br /> Attachment no. 2 :NA <br /> Data source : (CRG) <br /> Utilization <br />Oost Breakdown • Ownership cosUhour : $44.24 Nq <br /> Operating cosUhour : $63.93 100 <br /> Ripper op.cosUhour : $0.00 Nq <br /> Operator cosUhour : $30.65 Nq <br /> Total unit cosUhour $138.82 Total fleet cosUhour : $138.82 <br />MATERIAL QUANTITIES <br />Initial <br />volume : 94,307 LCY <br />Source of estimated volume :Far. L <br />Soume of estimated swell factor : NA <br />HOURLY PRODUCTION <br />Average push distance : 100 feet <br />Unadjusted hourly production : 852.6 LCYlhr <br />Material consistency description : <br />Consolidated stockpile <br />Swell <br />factor : NA <br />Average push gradient : 15.00 % (i <br />Average site altitude : 4,940 feet <br />Material weight : 2,550 Ibs/LCY <br />Weight descdption <br />Earth - Drv Docked <br />Fleet size : 1 Dozers) <br />Unit cost : $0.273 /LCY <br />Operator skill <br />Material consistency <br />Dozing method <br />Visibility <br />Job efficiency <br />Spoil pile <br />Push gradient <br />Altitude <br />Material weight <br />Blade type :_ <br />Net correction <br />Adjusted unit production <br />Adjusted fleet production <br />Total job time <br />Total job cost <br />0.75 <br />1.00 <br />1.00 <br />1.00 <br />0.83 <br />0.80 <br />1.33 <br />1.00 <br />0.90 <br />1.00 <br />0.60 <br />(Cat <br />