Laserfiche WebLink
• 2.05.3 Overburden <br />(6) <br />?.05.3 Coal Handling Structures <br />(7) <br />2.05.3 Coal Processing Waste <br />(8) and Non-Coal Processing <br />waste <br />?.05.3 Underground Development <br />(9) Waste <br />2.05.3 Return of Coal Processing <br />(10) Waste to Abandoned Workings <br />2.05.4 Reclamation Plan: <br />2.05.4 Timetables <br />(2) (a) <br />• 2.05.4 Reclamation Cost Estimates <br />(2) (b) <br />2.05.4 Backfilling and Grading <br />(2) (c) <br />2.05.4 Topsoil (Redistribution) <br />(2) (d) <br />2.05.4 Revegetation <br />(2) (e) <br />?.05.4 Disposal of Debris, Acid- <br />(2)(f) Forming and Toxic-Forming <br />Materials <br />2.05.9 Sealing or Managing Pfine <br />. (1)(g) Openings, Exploration <br />Roles, Other Boreholes or <br />Wells <br />tion in <br />Not Applicable <br />37 <br />38 <br />39 <br />40 <br />91 <br />lication <br />.NAPS <br />•Post-mining topography <br />2.05.4(2)(c) <br />-6- <br />