Laserfiche WebLink
Table 4. Monthly Peak Flows from Coyote Drainage <br />_ 10-year, 24hour parshall flume in 1990. <br />• <br />Date (month) <br />Graph Stage (h) Flow (cfs) <br />March 0.33 1.78 <br />April .08 0.20 <br />May .03 0.04 <br />June .01 <0.02 <br />July 0.00 0.00 <br />August 0.00 0.00 <br />September 0.00 0.00 <br />October 0.00 0.00 <br />November 0.00 0.00 <br />Note: Flow rates were minimal and precise values could not be determined during Ianuary, February and <br />December, 1990, as severe ice buildup occurred in flume and sampler graph removed. <br />WA/jsb [90ItEPT3] <br />• <br />• <br />