Laserfiche WebLink
a) Treatment of haul road; <br /> b) spraying of processed materials during crushing <br /> and conveying. <br /> Air emission permit C-11, 866 (FD) has been issued for this <br /> operation. <br /> 1 <br /> Timetable <br /> Mining will occur for approximately 15 years at the Nelson <br /> Pit. Reclamation, principally in the form of backfilling, <br /> grading and topsoiling, and seeding, will occur concurrently <br /> with mining. Final use of the land will be as a private <br /> recreation and wildlife area. <br /> E-5 <br />