Laserfiche WebLink
• <br />J <br />PERMIT CHRONOLOGY <br />(Current throw h 1/01) <br />Filing, Description <br />Submittal or <br />Issuance Date <br />Minor Revisions (Continued) <br />1/27/97 MR-40 - A lication b PBR correctin Permit Boundar on Ma s 13/31/97 decision) <br />7/9/97 MR-41 -Application by OCM to install emergency methane degassification wells <br /> (7/9/97 decision) <br />8/7/97 MR-42 -Application by OCM to install additional emergency methane degassification <br /> wells 18/28/97 decision) <br />8/28/97 MR-43 -Application by OCM for powerline relocation and light-use road (9/5/97 <br /> decision) <br />9/1/97 MR-44 -Application by OMI submitting updated West Valley Fill haul road drawings <br /> 19/5/97 decision) <br />9/29/97 MR-45 -Application by OCM to construct C-Gulch ventilation shaft (1/14/97 <br /> decision) <br />5/22/98 MR-46 -Application by OMI for SAE &ASC for West Valley Fill construction <br /> activities (5/22/98 deci~ionl <br />6/22/98 MR-47 -Application by OMI for removal of refuse from East Refuse Pile and use as <br /> fill for coal stock ile foundation (7/8/98 decision) <br />8/14/98 MR-48 -Application by OMI addressing bonding allocations and updated bond <br /> calculations (10/7/99 decision) <br />9/3/98 MR-49 -Application by OMI for elimination of Pond A and application of ASC <br /> measures (9/28/98 decision) <br />2125/99 MR-50 - A lication b OMI for emer enc fire control activities 110/8/99 decision) <br />3/18199 MR-51 - A lication b OMI for emer enc mine dewaterin (4/30/99 decision) <br />5/28/99 MR-52 - A lication b OMI to eliminate Ditch CD-2 culvert 16/14/99 decision) <br />12/9/00 MR-53 -Application by OMI for development mining in lease modification area <br /> 11 /12/00 decision) <br />8/7/00 MR-54 - A lication b OMI for Elk Creek Mine owerline 18/21/00 decision) <br />11/8/00 MR-55 -Application by OMI to construct catch bench and access road above D <br /> seam ortalll/10/01 decision) <br />1/19/01 MR-56 -Application by OMI for coalbed methane wells CBMI-CBM3 and associated <br /> roads (3/28/01 decision) <br />3/23/01 MR- 57 -Application by OMI for coalbed methane well CBM4-CBM5 and associated <br /> roads 14/11/01 decision) <br />5/7/01 MR-58 - To soil Recover Plan NOV Abatement 2 (decision endin 1 <br />5/18/01 MR-59 -Application by OMI to shift coalbed methane well locations (decision <br /> endin 1 <br />• <br />