Laserfiche WebLink
<br />• <br />• <br />PERMIT CHRONOLOGY <br />(Currentthrou h 1/btl <br />Filing, Description <br />Submittal or <br />Issuance Date <br />Technical Revisions (Continued) <br />4/20/93 TR-14 - A lication b SMC for SAE demonstrations 110/12/93 decision) <br />4/23/93 TR-15 -Application by SMC addressing NPDES discharge requirements and C-Seam <br /> sum (3/3/94 decision) <br />4/28/93 TR-16 -Application by SMC for second mine ventilation fan for Sanborn Creek Mine <br /> 15/17/93 decision) <br />8/3/93 TR-17 -Application by SMC addressing permit renewal responses and hydrologic <br /> monitorin 15/4/94 decision) <br />8/16/93 TR-18 -Application by SMC for reduction in hydrologic monitoring (11/10/93 <br /> decision) <br />9/20/93 TR-19 - A lication b SMC for tem ovary coal refuse ile 111/22/93 decision) <br />4/4/94 TR-20 - A lication by SMC for reduction in h drolo is monitorin (5/5/94 decision) <br />4/28/94 TR-21 -Application by SMC for East Yard coal reclaim system and access road <br /> 19/1/94 decision) <br />5/24/94 TR•22 - A plication by SMC for Substation No.3 17/1 1194 decision) <br />11/10/94 TR•23 - A lication b SMC for Bear Creek reclamation (7/26/95 decision) <br />11/11/94 TR-24 -Application by SMC for mine plan revisions and production increase to 1.3 <br /> million tons er year (2/17/95 decision) <br />3/16/95 TR-25 -Application by SMC for new ventilation intake decline for Sanborn Creek <br /> Mine 6/19/95 decision) <br />4/11/95 TR-26 - A lication b PBR for East Yard Sedimentation Pond (4/4/96 decision) <br /> TR-27 - A lication withdrawn <br />4/1/97 TR-28 -Application by OCM for reclamation of roads and powerlines (4/1/97 <br /> decision) <br />3/5/97 TR-29 -Application by OCM for phased expansion of mining operations to 4.0 <br /> million tons per year )includes installation of longwall in Sanborn Creek Mine and <br /> surface facilit modifications, 7/15/97 decision) <br />4/23/97 TR-30 -Application by OCM to eliminate woody stem density requirements (915/97 <br /> decision) <br />10/1/97 TR-31 -Application by OCM to incorporate longwall subsidence evaluation for <br /> Sanborn Creek Mine (4/30/99 decision) <br />11/3/98 TR-32 -Application by OMI for construction of surface facilities and initial <br /> develo ment of Elk Creek Mine (8/25/99) <br />5/12/99 TR-33 -Application by OMI providing as-builts for temporary mine dewatering pond <br /> 7/20/99 decision) <br />10/26!99 TR-34 -Application by OMI submitting hydrologic monitoring data for emergency <br /> mine water dischar a 17/9/99 decision) <br />6/21/99 TR-35 -Application by OMI updating PHC evaluation for 2,000 gpm mine discharge <br /> 11 /2/00 decision) <br />10/22/99 TR-36 -Application by OMI for reconstruction of Sedimentation Pond Al (1/31/00 <br /> Decision) <br />11/29/99 TR-37 -Application by OMI for incidental permit boundary revision for lease <br /> modification 11/14/00 decision) <br />3/16/01 TR-38 -Application by OMI for coalbed methane wells CBM6 - CBM11 and <br /> associated roads 13/28/01 decision) <br />Minor Revisions <br />6/22/84 Minor Revision a lication b USSC fore ui ment stora a areas (6!28/84 decision) <br />10/10/84 Minor Revision a lication b USSC for DMEA powerline <br />4/21 /86 MR-01 -Application by KCC incorporating revised timetrames for reclamation <br /> activities for Somerset Mine 16/18/86 decision) <br />9/15/86 MR-02 -Application by KCC to revise reclamation schedule for Somerset Mine <br /> 19/23/86 decision) <br />08/31/87 MA-03 - Ap lication b KCC to revise reclamation schedule for Somerset Mine <br />11/3/89 MR-04 - A lication b KCC for new coal stora a area (11/10/89 decision) <br />1 /22/90 MR-05 - A lication b SMC for installation of truck scale 11 /25/90 decision) <br />