Laserfiche WebLink
<br /> <br />'YPE OR PRI;1T CLEARLY <br />14. Present land use A riculturdl <br />(i.e., a3ricultural, industrial, etc.) <br />15. Proposed future land use R2 COnt0Ur the land and return t0 native <br />(Goal of reclamation) vegetation. <br />I*]STRUCTIO`IS: This application form must be submitted in duplicate and each fora must <br />be accompanied by the following information and items. The application <br />will not be processed until complete. See RULE 3 (for Limited Impact) <br />or RULE 4 (for Special 10-day) for additional guidance. <br />F~4IBIT A - Le.^,al Descrio[ion <br />The legal description must identify the affected land and be wholly adequate for <br />field location of the property. It can be in [he form of metes and bounds survey <br />or a description by reference to township, range, and section to at least the <br />nearest quarter quarter section. Slhere applicable, the street address or lot <br />number(s) may be used. <br />E:~IBIT B - :Lining Plan <br />This can be a general discussion of the methods, equipment, phases or stages of <br />the operation and those portions of land affected by each. The plan should be <br />closely correlated with the map and should show where extraction will begin, which <br />direction it will proceed. <br />rr''I3IT C - ".30 <br />This Tap should be as comprehensive as possible in terns of clearly defining <br />[he pe rsit boundaries and indicating all roads or stockpile areas to be used in <br />connect_on with t`.ie operation. A1'_ ivmediately adjacent landowners must be shown. <br />The closest quarter section corner, section line, or any otter locateable point <br />should also be shown on [he man. <br />-E.y-IIBIT D - :+i'_dlife, '.pater Resources, Veeet flop and Soils Informatien <br />Each of the above-ventioned subjects must be addressed as outlined in t`.e <br />applicable Rule, under item number [en (10). <br />E:~itI3IT E - Reclamation Plan <br />As with [he mining Dian, this should be a general discussion of the aethods, <br />equipment, phases or stages of the reclamation process and those portions of <br />,land affected by each. Zf possible, the plan s'r.ould be closely correlated <br />vith the map. If not, the narrative must be comprehensive enough to draw an <br />accurata verbal picture of the expected physical apoeara:.ce of the area after <br />completion of reclamation. <br />~iiBIT r- - ?:roof of Local Gover:uaent ~ooroval <br />:'his must be a letter from the local government specifying conformance with <br />existing zoning regulations. <br />:C-iI3iT G - Source of Le2a1 R_ght to Enter <br />;his could be a cony of the '_ease, deed, abstract of title, or current tax <br />receipt. In lieu thereof, a statement ackaowledeed by a notary public that <br />the operator pas the '_egal right co enter ar.d mine will be accepted. <br />*tFOR SPECIAL 10-ia'f ?E:~`tITS ONLY" <br />"+1?I3IT 1 - Rec'_amaticn Co is <br />L the surety 's requested to be less than S'_500, the operator must submit <br />facts to sup?orc suc5 re;uest. O[her.~ise a surety of $0500 will automatically <br />be set. <br />E}7IIBIT I - :errs of Governmental Contract <br />The operator must submit a copy of the ccntract or other proof that proves the <br />necessit;~ of a special 10-day permit. The operator must also submit evidence <br />of the surety ?rov_ded under the governmental contract, if it was requ'--red. <br />