Laserfiche WebLink
-3 . <br />EXHIBIT C - Nao <br />This map should clearly define the permit bounr.'aries and contain sufficient tnfn,~~yrfon <br />to determine the location o.' the affected Iand on the ground end existing and pr~~J,,.~ed <br />roads or access routes to ba ued in connection with the mining operation. All <br />immediately adjacent Landowners of record must be shown. The quarter section cor„ar <br />section Line, or any other locatable points should also be shown on this map. ' <br />EXHIBIT D - Wildlife, Water Resources, Vegetation and Soils Znformati on <br />Each of the above-mentioned subjects must be addressed as outlined in the applicat,~e <br />RULE. <br />EXHIBIT E - RecIemetion Plan <br />As with the alining plan, this should be a general discussion of the aethods, a7 ui J•M+n t, <br />phases of stages of the reclamation process and those portions of Land affected hU •ech. <br />If possible, the plan should be closely rnrrelated with the trop. If not, the nar,atiy~y <br />must be corr~rehensive enough to draw an accurate verbal picture of the expected aJ,(,aa r, <br />once of the area after completion of reclamation. <br />EXHIBIT F - Proof of Corr~liance with Local Government Zoning <br />Zn accordance with 34-3?-IZS(4)(e), the Hoard must make a ..`inding that the operate„rr <br />will be in compliance with local zoning or subdivision regulations. You are not <br />required to submit this infor:~a ti on, but a su3.:i ssi on would assist the Di vi si on'a J~ro- <br />cessinq o° the application, when the Division notifies the Local govern:.rnt of rl,a <br />existence of this application, it will request infomati on regarding compliance wll ~f <br />applicable Ioca2 law. It is intended that operators may conccrrently come into ,~r,,,t,li- <br />ance with Local requirements at the same.tiae the Division is processing this appJr,_~_ <br />Lion. Information regarding the status with local government will be helpful. <br />EXHIBIT G - Source of Leal Picht to Enter <br />This could be a copu of the (ease, deed, abstract of title, or current tax receipt, <br />An acceptable alternative would be a statement acknowledged by a notary public that the <br />operator has the legal right to enter and mine. <br />EXHIBIT H - Reclamation Costs <br />Poi a 110 permit, if the operator requests financial warranty to be less then SS,p~J~,00, <br />the operator crust submit facts La support such a request. Otherwise, a financial rnrranty <br />of 55,000.00 wi12 automatically be set. For all I11 permits, the financial warranty aha1Z <br />be 52,500,00 per acre. <br />EXHIBIT r - Terr<s of Governmental Contracts (I1I Applications only) <br />For ~cecial 10-Day~(i11) permits, the operator must submit a copy of the contract .. r. <br />other proof that proves the necessity of a special 10-day permit. The operator m,i~J also <br />submit evidence of the fin a_~ci a1 warranty provided under the governmental contract, j: <br />it was req;u red. <br />