Laserfiche WebLink
<br />ENVIRONMENT, INC. PAGE 5 <br />MARCH 26, 2001 <br />14. The exact location of any swim beaches is not known at this <br />time. They were listed in the text as examples of what hype <br />of uses may occur on a lake when mining ends. Yf their <br />inclusion on maps is necessary, P56G states that no swim <br />beaches will be included in the reclamation plan unless they <br />are build to MLR requirements. Some flexibility is necessary <br />in the plan, so as the area develops PS6G and the landowners <br />have control over- the end use. If a swim beach is to be left <br />in a lake area we will commit to making them 5:1 or less as <br />required and showing their location in our annual report map. <br />One way to look at it is that if the operator chooses to leave <br />slopes shallower than what is required by the law they would <br />still be in compliance with the overall reclamation plan. <br />15. Attached is a letter and affidavit addressing Rule 3.1.5 (a} <br />to (f ). <br />16. The typical pond design can be seen on Adequacy Exhibit 3 and <br />the layout relationship of the plants is shown on Adequacy <br />Exhibit 2. As for reclamation, the ponds will be cleaned as <br />needed and when the plant site is mined they will be removed. <br />if they remain when mining ends the above water banks will be <br />reclaimed as described in the reclamation plan text and the <br />ponds would become lake areas. <br />17. The NRCS suggestion is a blanket recommendation they use in <br />their response to an operators request for information and as <br />such P56G did not chose to make it part of the reclamation <br />plan, after all, they are responsible for making the grass <br />grow and to complete reclamation as approved. I want to thank <br />the MRCS for their recommendation but respectfully reject it <br />in this case. <br />Rule 6.4.7 Exhibit G - Water in/ormation . <br />18. No water will be used during mining or reclamation and <br />assuming the lakes are not lined one would expect 2,274.23 <br />acre feet or water to evaporate from the exposed lake areas <br />each year. This assumes that 768.32 acres of lake surface is <br />created with an average net annual evaporation of 2.96 ac- <br />ft/surface acre. Page 19 of the application shows that <br />average consumptive uses is estimated to be as much as 15 af= <br />ft per year. This would be associated with dust control, <br />processing and washing activities. This is for an average <br />year and may be higher or lower depending on actual condi- <br />tion's encounter in the future. The flow rates associated <br />with this use will vary with the dryness of the climate and <br />other uncontrollable variable. The estimated amount of water <br />lost with finished product is 48 by weight so it is consistent <br />with OSE guidelines and is included in the 15 ac-ft estimate. <br />19. Platte Sand 6 Gravel LLC has no current water rights to use <br />for make up water. They are working on this and be assured <br />