Laserfiche WebLink
~- = <br />-3- <br />determined: <br /> <br />b). The Board will enter the lands to perform reclamation only if [he Board has <br />has not been performed, and <br />that reclamation required by law to have been performed upon such lands <br />ii. that financial warranty Forfeiture proceedings described in the Act or similar <br />provisions of subsequent laws, if any, have been initiated. <br />c). The Division, acting for the Board, will enter lands to respond to an emergency only <br />where [he Division determines that any of the conditions of Construction Material Rule 8.4.2. exist. <br />7). The additional conditions set forth in the attached rider, if any, are incorporated herein by <br />reference. <br />/_/ a) Rider is attached. <br />XX ( b) No rider is attached. <br />MINED LAND RECLAMATION BOARD <br />COLORADO DEPARTMENT OF NATURAL RESOURCES <br />MICHAEL B. L N <br />Division Director <br />M: \OSS\BDC\TEM P\ MA P28039. CLK <br />