Laserfiche WebLink
`. <br />No~~>k {tasouru ~ <br />D~~ F~' G~ <br />B~aai~9 a125oa7 <br />P.O, Boz gp225-pp47 <br />p~nver~ CO <br />GOLD BILL VENTURES <br />P.O. Boz 1523 <br />Longmont, Colorado 80501 <br />September 23, 1985 <br />Mr. Peter V. O'Connor <br />Reclamation Specialist <br />Mined Land Reclamation Division <br />1313 Sherman Street <br />Denver, CO 80203 <br />RE: CASH MINE AMENDMENT -PERMIT NO. M83-141 <br />Dear Mr. O'Connor: <br /> <br />SEP 2 3 i9b:, <br />MiriED LAND <br />RECLAMATION DIVISION <br />This letter is in response to the concerns that you raised in your letter <br />of September 16, 1985, regarding our Application for an Amendment to <br />the Cash Mine Limited Impact Permit. <br />Tailin¢s Reclamation <br />1. In order to revegetate the tailings retention structure in a manner <br />that will establish a diverse, effective, and long-lasting vegetative <br />cover on the land surface affected by the impoundment of the mill <br />tailings, a rock capillary barrier will be placed between the tailings <br />and the topsoil medium. This rock barrier will be placed on the <br />three sloping sides oP the tailings embankment and the relatively <br />flat surface of the former tailings pond. The minimum depth oP this <br />rock capillary barrier will be two feet. It will be obtained from the <br />mine dump sorting and upgrading operations at the Cash end Who <br />Do mines, and the shaft sinking and underground exploration and <br />development work at the Who Do mine. The waste rock from these <br />operations will consist of unmineralized, unaltered granite and <br />schist with lesser amounts of aplite and pegmatite. About 60 per- <br />cent of this rock capillary material will be 3 inches or smaller in ~r <br />size, while 30 percent will be between 3 inches and 6 inches, and <br />only 10 percent will be very coarse material that will range up to <br />15 inches in size. This size range will help achieve an effective <br />capillary barrier that will inhibit the upward migration of contami- <br />nants [rom the underlying mill tailings. So that this waste rock will <br />be readily available for use in reclaiming the tailings impoundment <br />structure, it will be segregated end placed near the existing lower <br />access roads that serve the Cash and Who Do mines. A small <br />front-end loader and dump truck will be used to load and transport <br />this waste rock to the tailings retention area. Tn order to install a <br />minimum two foot rock capillary barrier between the mill tailings <br />and the topsoil medium, it will be necessary to haul approximately <br />11,500 tons o[ waste rock from the Cash and Who Do mines. The <br />11,, / / ~ / / / / , ,_ <br />S'.. ce d+~;5 ,. ,-, f~.+d'ad s~ .. .~. / ems.- 9rc~~.'~i~ d(.: r'J.G oL~; .Lv.~6~.. i~ .., ,,Y.., reG <br />d:,,~(' n.. ~ 1A ,.j<:,~, % ~cL.+-~~c~-JG ~idi,ti-.~ ~:, 4c-> d-~- , .~/tom.- i <br />i 7 L! <br />