My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE112462
DRMS
>
Back File Migration
>
Permit File
>
200000
>
PERMFILE112462
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:08:48 PM
Creation date
11/24/2007 9:32:14 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1991146
IBM Index Class Name
Permit File
Doc Date
5/10/1999
Doc Name
ZMK GRAVEL PIT PN M-91-146 ENCLOSED BOND RECALCULATION
From
DMG
To
MONADNOCK MINERAL SERVICES
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />002ER COST 8 PERFORMANCE DATA NORKSHEET cont'd sheet 2 of 2 <br />Model: Cat D7H 5.2 (1996) SEMI-UNIVERSAL <br />ADJUSTED COST SUBTOTALS <-------------- Ownership --------------> <--------------------- Overhaul 8 Operating -----------------------> <br /> <--Overhaul --> <-Field Repai r-> <br /> Depreciation CFC Overhead Labor Parts Labor Parts Fuel Lube Tires G.E.C. <br />Dozer, ROPS & Attachment #2: Dozer 8 ROPS• <br />Single shifts E14.80 58.72 E7.78 E3.03 E71.71 E3.75 E9.46 E9.31 E2.78 E0.00 E7.79 <br />Double shifts E11.10 E4.36 E3.89 Attachment #2: <br />Triple shifts E9.87 E2.90 E2.59 E0.00 E0.00 50.00 E0.00 E0.00 E0.00 50.00 50.00 <br />HOURLY OPERATOR WAGES <br /> Base Fringe F.i.C.A Unempl. Wk. Lmp. Total I Shift ~ Teamsters Labor <br />Labor Description Rate Benefits 7.70X 6.20X 72.SOX (E/hr) ~ Differential ~ 2one: <br />Dozer operator (< 70hp) E14.32 E4.13 E1.10 50.89 E1.79 E22.23 ~ Day E0.00 12 shift/day avg.: E0.15 <br />Dozer operator (>=70hp) E15.02 E4.13 E1.76 50.93 E1.88 E23. 12 ~ Swing: E0.30 ~ 3 shiftlday avg.: E0.25 <br />Mechanic E15.32 E4.13 51.18 E0.95 E1.92 523.49 ~ Night: E0.45 <br />HOURLY EQUIPMENT COST SUMMARY <br /> < ----- Operating 8 Overhaul ------ > Total <br /> Ownership Machine Attachments Operator Cost/hr (E) <br />Single shifts E31.30 E41.23 50.00 523.72 E95.65 <br />Double shifts E79.35 E41.23 E0.00 E23.27 E83.84 <br />Triple shifts E15.37 E41.23 E0.00 E23.37 579.96 <br />EQUIPMENT PERFORMANCE DATA <br />- - - EQUIPMENT SPECIFICATIONS - - - <br /> Horsepower Transmission Weight Length Width Height Fuel Ripper <br /> Description (FHP) Type (UST) (ft) (ft) (ft) type type <br />Dozer Cat D7H S.2 (19 215 Powershift 22.9 19.8 9.4 10.9 diesel NA <br />Blade Semi-Universal NA NA 4.0 NA 12.1 5.0 NA NA <br />Attachment #1 ROPS Cab NA NA NA NA NA NA NA NA <br />Attachment #2 NA NA NA NA NA NA NA NA NA <br /> Total wt.: 26.8 (UST) <br />
The URL can be used to link to this page
Your browser does not support the video tag.